BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATBootcamp Starts Sep 28
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE BOOTCAMP

Live Online Bootcamp Class with Top GMAT Expert Chris Peckover

15 live classes from Sep 28, 2026

Schedule
Mon to Fri · 7:00 to 10:00 PM ET
Included
Live classes + 6 months of TTP OnDemand
  • Boost your GMAT score in less than one month in a live online class
  • 6 months access to TTP OnDemand video courses included
View bootcamp & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Radioactive waste!_LSAT

Expert replies
by gmat_perfect » Mon Jun 14, 2010 11:06 am
Radioactive waste from nuclear power plants has been temporarily stored on-site, but this is not a satisfactory kind of place for long-range storage. Since no suitable plan of safe permanent storage of such waste from the nation's existing and planned nuclear plants has been devised, some people propose that we should stop trying to develop such a plan and instead should shut down all present nuclear plants and build no new nuclear plants.

The proposal mentioned above falls short of offering a complete solution to the problem it addresses because

(A) it would prevent the development of safe technologies for the producing electric power
(B) it does not distinguish between nuclear plants that have, and plants that do not have, a reputation for operating safely
(C) it does not provide for the permanent storage of already existing waste
(D) the generation of electric power from fossil fuels is relatively safe
(E) the risks of unsafe disposal of waste from nuclear power plants lie in the future, but the benefits from such plants are in the present

OA: Later
Join the discussion
Source: — Critical Reasoning |

by sk818020 » Mon Jun 14, 2010 11:50 am
IMO C.

The solution described doesn't give us a complete solution because what are you going to do with all of the waste you already have.

What is the OA?
Join the discussion

by hardik.jadeja » Mon Jun 14, 2010 3:16 pm
IMO C. Same reasoning as above.
Join the discussion

by nikhilkatira » Wed Jun 16, 2010 10:22 am
hardik.jadeja wrote:IMO C. Same reasoning as above.
AGREE.

OA PLEASE
Best,
Nikhil H. Katira
Join the discussion

by Shawshank » Thu Jun 17, 2010 3:14 am
IMO -- C
++++++++++++++++++++++++++++++
Shawshank Redemtion -- Hope is still alive ...
Join the discussion