BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

prep question

Expert replies
by jc114 » Thu Apr 19, 2007 6:51 am
(1) Machine A can produce x products in 1hour, machine b can produce x products in 3 hours. If machine A and B work together to produce x products, what is the ratio of the products that the faster machine produces to total products?

A. 1/4

B. 1/2

C. 3/4

D.1

E. 5/4
Join the discussion
Source: — Problem Solving |

Re: prep question

by jayhawk2001 » Thu Apr 19, 2007 9:52 pm
jc114 wrote:(1) Machine A can produce x products in 1hour, machine b can produce x products in 3 hours. If machine A and B work together to produce x products, what is the ratio of the products that the faster machine produces to total products?

A. 1/4

B. 1/2

C. 3/4

D.1

E. 5/4
Working for 1 hour, we get a total of x + x/3 products when A and B work
together. So, ratio of products from A (the faster one) to the total
products =

x / (x + x/3)
= x / (4x/3)
= 3/4

Is C the answer ?

I guess we can also employ pure POE here. The answer cannot be
greater than 1. So, that leaves out D and E. Also, the ratio cannot be
1/2 (as both machines don't work at same speed). It can't be less than
1/2 as well as we are talking about ratio of faster machine to total.

So, POE would mean C :-)
Join the discussion

by Scott@TargetTestPrep » Mon May 20, 2019 6:11 pm
jc114 wrote:(1) Machine A can produce x products in 1hour, machine b can produce x products in 3 hours. If machine A and B work together to produce x products, what is the ratio of the products that the faster machine produces to total products?

A. 1/4

B. 1/2

C. 3/4

D.1

E. 5/4
The rate of machine A is x, and the rate of machine B is x/3. Thus, we see that the faster machine is machine A. If the two machines work together for 1 hour, they will make:

x + x/3 = 4x/3

products. Of those 4x/3 products, machine A will have produced x of them. Thus, the ratio of machine A's product to that of the combined output is:

x/((4x)/3) = 3/4.

Alternate Solution:

Notice that as the two machines operate at constant rates, the ratio of the output of the faster machine (which is machine A) to the total output is the same for any amount time they work together. So, let's calculate the ratio of the products produced by machine A when the two machines together work for 1 hour.

In one hour, machine A will produce 3x products and machine B will produce x products; for a total of 3x + x = 4x products. Of these 4x products, 3x was produced by machine A; therefore the ratio we are looking for is 3x/4x = 3/4.

Answer: C

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion