Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

prep question

Expert replies
by jc114 » Thu Apr 19, 2007 6:51 am
(1) Machine A can produce x products in 1hour, machine b can produce x products in 3 hours. If machine A and B work together to produce x products, what is the ratio of the products that the faster machine produces to total products?

A. 1/4

B. 1/2

C. 3/4

D.1

E. 5/4
Join the discussion
Source: — Problem Solving |

Re: prep question

by jayhawk2001 » Thu Apr 19, 2007 9:52 pm
jc114 wrote:(1) Machine A can produce x products in 1hour, machine b can produce x products in 3 hours. If machine A and B work together to produce x products, what is the ratio of the products that the faster machine produces to total products?

A. 1/4

B. 1/2

C. 3/4

D.1

E. 5/4
Working for 1 hour, we get a total of x + x/3 products when A and B work
together. So, ratio of products from A (the faster one) to the total
products =

x / (x + x/3)
= x / (4x/3)
= 3/4

Is C the answer ?

I guess we can also employ pure POE here. The answer cannot be
greater than 1. So, that leaves out D and E. Also, the ratio cannot be
1/2 (as both machines don't work at same speed). It can't be less than
1/2 as well as we are talking about ratio of faster machine to total.

So, POE would mean C :-)
Join the discussion

by Scott@TargetTestPrep » Mon May 20, 2019 6:11 pm
jc114 wrote:(1) Machine A can produce x products in 1hour, machine b can produce x products in 3 hours. If machine A and B work together to produce x products, what is the ratio of the products that the faster machine produces to total products?

A. 1/4

B. 1/2

C. 3/4

D.1

E. 5/4
The rate of machine A is x, and the rate of machine B is x/3. Thus, we see that the faster machine is machine A. If the two machines work together for 1 hour, they will make:

x + x/3 = 4x/3

products. Of those 4x/3 products, machine A will have produced x of them. Thus, the ratio of machine A’s product to that of the combined output is:

x/((4x)/3) = 3/4.

Alternate Solution:

Notice that as the two machines operate at constant rates, the ratio of the output of the faster machine (which is machine A) to the total output is the same for any amount time they work together. So, let’s calculate the ratio of the products produced by machine A when the two machines together work for 1 hour.

In one hour, machine A will produce 3x products and machine B will produce x products; for a total of 3x + x = 4x products. Of these 4x products, 3x was produced by machine A; therefore the ratio we are looking for is 3x/4x = 3/4.

Answer: C

Scott Woodbury-Stewart
Founder and CEO
[email protected]