BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

rates and production of fiber

Expert replies
by LevelOne » Sat Jun 20, 2009 10:36 pm
Machine A, operating alone at its constant rate, produces 500 feet of a particular fiber in 2 hours. Machine B, operating alone at its constant rate, produces 500 feet of the same fiber in 3 hours. Machine C, operating alone at its constant rate, produces 500 feet of the same fiber in 5 hours. How many hours will it take machines A, B, and C, operating together at their respective rates, to produce 1,000 feet of the fiber?

I solved it as below, however the official explanation was quite different than my calculations. Can you make a few suggestions, how you would solve it, pls? Thanks!

rates:
1/2 -> machine A
1/3 -> machine B
1/5 -> machine C

1/2 + 1/3 + 1/5 = 5/6 + 1/5 = 25/30 + 6/30 = 31/30

30/31*2 = 60/31
Join the discussion
Source: — Problem Solving |

by rah_pandey » Sun Jun 21, 2009 3:37 am
The approach should be
in 1 hour how much each machine can produce
500/2,500/3,500/5

therefore working together in one hour they will produce
500/2+500/3+500/5
=500(15+10+6)/30
=(500*31)/30

thus for making 1000 feet time reqd
=1000*30/(500*31)
=60/31

your soln is effective and has no problems if you are sure what you were doing. Explaining it and may understanding it becomes difficult.
2 in your soln can be written as 1000/500

where 500*31/30= amt produced in 1 hour
therefore 1000 feet would be produced in
=(1000*30)/(500*31)=(1000/500)*(30/31)=2*30/31
Join the discussion

by LevelOne » Sun Jun 21, 2009 5:32 am
rah_pandey, thanks for the comparison your solution is the same as in
the official source. i might go by this method for the future problems.
Join the discussion

Re: rates and production of fiber

by Ian Stewart » Sun Jun 21, 2009 11:55 am
LevelOne wrote:Machine A, operating alone at its constant rate, produces 500 feet of a particular fiber in 2 hours. Machine B, operating alone at its constant rate, produces 500 feet of the same fiber in 3 hours. Machine C, operating alone at its constant rate, produces 500 feet of the same fiber in 5 hours. How many hours will it take machines A, B, and C, operating together at their respective rates, to produce 1,000 feet of the fiber?
An alternative to using the formula: Let's call producing 500 feet 'one job'. The question asks how long it takes A, B and C take to do two jobs - that will take twice as long as doing one job. Converting each machine to the same amount of time:

A does 15 jobs in 30 hours
B does 10 jobs in 30 hours
C does 6 jobs in 30 hours
A+B+C do 31 jobs in 30 hours
A+B+C do 1 job in 30/31 hours

So they do 2 jobs in 60/31 hours.
For online GMAT math tutoring, or to buy my higher-level Quant books and problem sets, contact me at ianstewartgmat at gmail.com

ianstewartgmat.com
Join the discussion