Machines operating simultaneously

This topic has expert replies
User avatar
Master | Next Rank: 500 Posts
Posts: 146
Joined: Fri Jun 25, 2010 3:42 am
Thanked: 3 times
Followed by:1 members
GMAT Score:560

Machines operating simultaneously

by alivapriyada » Tue Sep 14, 2010 12:51 pm
It takes machine A x hours to manufacture a deck of cards that machine B can manufacture in y hours. If machine A operates alone for z hours and is then joined by machine B until 100 decks are finished, for how long will the two machines operate simultaneously?


A. (100xy - z)/(x + y)

B. y(100x - z) /(x + y)

C. 100y(x - z)/(x + y)

D. x + y /(100xy - z)

E. (x + y - z)/ 100xy
Source: — Problem Solving |

User avatar
Legendary Member
Posts: 866
Joined: Mon Aug 02, 2010 6:46 pm
Location: Gwalior, India
Thanked: 31 times

by goyalsau » Tue Sep 14, 2010 1:45 pm
alivapriyada wrote:It takes machine A x hours to manufacture a deck of cards that machine B can manufacture in y hours. If machine A operates alone for z hours and is then joined by machine B until 100 decks are finished, for how long will the two machines operate simultaneously?


A. (100xy - z)/(x + y)

B. y(100x - z) /(x + y)

C. 100y(x - z)/(x + y)

D. x + y /(100xy - z)

E. (x + y - z)/ 100xy

I will go with B.
what's the answer?

Legendary Member
Posts: 1119
Joined: Fri May 07, 2010 8:50 am
Thanked: 29 times
Followed by:3 members

by diebeatsthegmat » Tue Sep 14, 2010 7:52 pm
alivapriyada wrote:It takes machine A x hours to manufacture a deck of cards that machine B can manufacture in y hours. If machine A operates alone for z hours and is then joined by machine B until 100 decks are finished, for how long will the two machines operate simultaneously?


A. (100xy - z)/(x + y)

B. y(100x - z) /(x + y)

C. 100y(x - z)/(x + y)

D. x + y /(100xy - z)

E. (x + y - z)/ 100xy
A made 1 deck of card in x hour so in x hour it will make z/x deck of card
then B join with A.
the time it takes both A and B to make a deck of card is 1/x+1/y=1/a ( a is the time) so a= xy/x+y)
thus together they both have to make 100-z/x in b hour
b=(100-z/x)*xy/(x+y)
you calculated that and get the right answer B

User avatar
Master | Next Rank: 500 Posts
Posts: 146
Joined: Fri Jun 25, 2010 3:42 am
Thanked: 3 times
Followed by:1 members
GMAT Score:560

by alivapriyada » Tue Sep 14, 2010 11:16 pm
diebeatsthegmat wrote:
alivapriyada wrote:It takes machine A x hours to manufacture a deck of cards that machine B can manufacture in y hours. If machine A operates alone for z hours and is then joined by machine B until 100 decks are finished, for how long will the two machines operate simultaneously?


A. (100xy - z)/(x + y)

B. y(100x - z) /(x + y)

C. 100y(x - z)/(x + y)

D. x + y /(100xy - z)

E. (x + y - z)/ 100xy

A made 1 deck of card in x hour so in x hour it will make z/x deck of card
then B join with A.
the time it takes both A and B to make a deck of card is 1/x+1/y=1/a ( a is the time) so a= xy/x+y)
thus together they both have to make 100-z/x in b hour
b=(100-z/x)*xy/(x+y)
you calculated that and get the right answer B
many thanks!!! answer is B