BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
Vote for Target Test Prep, Newsweek Readers’ Choice Awards 2026
NEWSWEEK READERS’ CHOICE 2026

BIG NEWS! Target Test Prep has been nominated, and they’d love your vote!

TTP has worked incredibly hard to build the best test prep experience possible, and winning Newsweek’s 2026 Readers’ Choice Award for Best Test Prep would mean a lot to them. If TTP has helped you, they’d be incredibly grateful for your vote. You can vote once each day through September 9.

Vote for TTP
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Machines A, B and C produce identical balls at their

Expert replies
by BTGmoderatorLU » Tue Dec 11, 2018 2:51 pm

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty

Source: e-GMAT

Machines A, B and C produce identical balls at their respective constant rates. If machines A and B operating simultaneously can produce a batch of balls in 4 hours and 48 minutes, in how much time can machines A and C operating simultaneously produce the same batch of balls?

1) Machines A, B and C operating simultaneously can produce the same batch of balls in 24/11 hours.
2) Machine B operating alone takes 50 percent more time to produce the same batch of balls than Machine A operating alone.

The OA is C.
Join the discussion
Source: — Data Sufficiency |

by Jay@ManhattanReview » Tue Dec 11, 2018 9:22 pm
BTGmoderatorLU wrote:Source: e-GMAT

Machines A, B and C produce identical balls at their respective constant rates. If machines A and B operating simultaneously can produce a batch of balls in 4 hours and 48 minutes, in how much time can machines A and C operating simultaneously produce the same batch of balls?

1) Machines A, B and C operating simultaneously can produce the same batch of balls in 24/11 hours.
2) Machine B operating alone takes 50 percent more time to produce the same batch of balls than Machine A operating alone.

The OA is C.
Say Machines A, B and C, working individually, produce the same batch of balls in a, b, and c hours.

Given that machines A and B operating simultaneously can produce a batch of balls in 4 hours and 48 minutes = 24/5 hours

Thus, as per the information, we have,

1/a + 1/b = 1/(24/5) => 1/a + 1/b = 5/24 ---(1)

We have to get the value of reciprocal of (1/a = 1/b).

Let's take each statement one by one.

1) Machines A, B and C operating simultaneously can produce the same batch of balls in 24/11 hours.

1/a + 1/b + 1/c = 1/(24/11) => 1/a + 1/b + 1/c = 11/24 ---(2)

But we can't get the value of 1/a + 1/c even with the help of eqn (1), though we can get the value of 1/c.

From eqn (1) and (2), we have (1/a + 1/b + 1/c) - (1/a + 1/b) = 11/24 - 5/24 = 6/24 = 1/4

=> 1/c = 1/24. Insufficient.

2) Machine B operating alone takes 50 percent more time to produce the same batch of balls than Machine A operating alone.

=> b = 1.5a. Insufficient

(1) and (2) together

From eqn (1), we have 1/a + 1/(1.5a) = 5/24 =>2.5/a = 5/24 => 1/a = 1/12

Thus, 1/a + 1/c = 1/12 + 1/24 = 3/24 = 1/8

=> Machines A and C operating simultaneously produce the same batch of balls in reciprocal of 1/8 = 8 hours. Sufficient.

The correct answer: C

Hope this helps!

-Jay
_________________
Manhattan Review GMAT Prep

Locations: Manhattan Review Warangal | Hyderabad | GRE Prep Himayatnagar | Dilsukhnagar GRE Coaching | and many more...

Schedule your free consultation with an experienced GMAT Prep Advisor! Click here.
Join the discussion