BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Machines A and B, working simultaneously at their

Expert replies
by gmat_guy666 » Tue Jun 09, 2015 7:14 am
Machines A and B, working simultaneously at their respective constant rates produce m units in 1 hour. If working independently it takes machine B 3 hours less than machine A to produce 2m units, how long does it take machine A to produce 5m units?

A. 1 hour
B. 2.4 hours
C. 2.5 hours
D. 6 hours
E. 15 hours

OA [spoiler](E)[/spoiler]
Last edited by gmat_guy666 on Tue Jun 09, 2015 8:39 am, edited 1 time in total.
Join the discussion
Source: — Problem Solving |

by Brent@GMATPrepNow » Tue Jun 09, 2015 7:26 am
gmat_guy666 wrote:Machines A and B, working simultaneously at their respective constant rates produce m units in 1 hour. If working independently it takes machine B 3 hours less than machine A to produce 2m units, how long does it take machine A to produce 5m units?

A. 1 hour
B. 2.4 hours
C. 2.5 hours
D. 6 hours
E. 15 hours
When posting questions, please use the spoiler function to hide the correct answer. This will allow others to attempt the question without seeing the final answer.

This question requires few calculations. In fact, we can just apply a bit of logic.

Machines A and B, working simultaneously at their respective constant rates produce m units in 1 hour.
IF the two machines worked at SAME speed (i.e., had the same output), this would mean that machine A (working alone) creates (1/2)m units in 1 hour.

...working independently it takes machine B 3 hours less than machine A to produce 2m units
This tell us that machine B is FASTER than machine A.
So, we can conclude that machine A (working alone) creates FEWER THAN (1/2)m units in 1 hour.

How long does it take machine A to produce 5m units?
IF machine A (working alone) creates (1/2)m units in 1 hour, then it would take 10 hours to produce 5m units.
Since machine A (working alone) creates FEWER THAN (1/2)m units in 1 hour, then it would take MORE THAN 10 hours to produce 5m units.

Only answer choice E meets this condition.

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by DavidG@VeritasPrep » Tue Jun 09, 2015 7:36 am
Machines A and B, working simultaneously at their respective constant rates produce m units in 1 hour. If working independently it takes machine B 3 hours less than machine A to produce 2m units, how long does it take machine A to produce 5m units?

A. 1 hour
B. 2.4 hours
C. 2.5 hours
D. 6 hours
E. 15 hours
Backsolve!

(Let's say m = 1, so 2m = 2, and 5m = 5.)

Sometimes I like to start at the bottom and work up.

Say it takes A 15 hours to produce 5 units. So A's rate is 5 units/15 hours or 1 unit/3 hours.

We know that together they can make 1 unit an an hour. So

1/3 + Rate B = 1. Rate B = 2/3. Thus B could make 2 units every 3 hours.

We also know that the time it takes B to make 2 units should be 3 hours less than the time it takes A to make 2 units. We discovered that it takes B 3 hours to make 2 units. If A makes 1 unit every 3 hours, it will take A 6 hours to make 2 units. If it takes B 3 hours to make 2 units, and it takes A 6 hours to make 2 units, we have our 3 hour difference. E is the answer.
Veritas Prep | GMAT Instructor

Veritas Prep Reviews
Save $100 off any live Veritas Prep GMAT Course
Join the discussion

by GMATGuruNY » Tue Jun 09, 2015 7:37 am
gmat_guy666 wrote:Machines A and B, working simultaneously at their respective constant rates produce m units in 1 hour. If working independently it takes machine B 3 hours less than machine A to produce 2m units, how long does it take machine A to produce 5m units?

A. 1 hour
B. 2.4 hours
C. 2.5 hours
D. 6 hours
E. 15 hours
Let m=6 units, implying that 2m=12 units and that 5m=30 units.
We can PLUG IN THE ANSWERS, which represent A's time to produce 5m units.
When the correct answer choice is plugged in, A's time produce 12 units will be 3 hours more than B's time.

Answer choice D: 6 hours
Since A takes 6 hours to produce 30 units, A's rate = w/t = 30/6 = 5 units per hour.
Since A and B together take 1 hour to produce 6 units, A and B's combined rate = w/t = 6/1 = 6 units per hour.
Thus:
B's rate = (combined rate for A and B together) - (A's rate alone) = 6-5 = 1 unit per hour.
Time for A to produce 2m units = w/r = 12/5 = 2.4 hours.
Time for B to produce 2m units = w/r = 12/1 = 12 hours.
Here, A's time is LESS than B's time.
Since A must take 3 hours LONGER than B, A's time to produce 5m units must INCREASE.

The correct answer is E.

Answer choice E: 15 hours
Since A takes 15 hours to produce 30 units, A's rate = w/t = 30/15 = 2 units per hour.
Since A and B together take 1 hour to produce 6 units, A and B's combined rate = w/t = 6/1 = 6 units per hour.
Thus:
B's rate = (combined rate for A and B together) - (A's rate alone) = 6-2 = 4 units per hour.
Time for A to produce 2m units = w/r = 12/2 = 6 hours.
Time for B to produce 2m units = w/r = 12/4 = 3 hours.
A's time - B's time = 6-3 = 3 hours.
Success!
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion