BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Machine \(A\) produces pencils at a constant rate of \(9000\) pencils per hour, and machine \(B\) produces pencils at

Expert replies
by Gmat_mission » Sun Dec 12, 2021 1:42 am

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty

Machine \(A\) produces pencils at a constant rate of \(9000\) pencils per hour, and machine \(B\) produces pencils at a constant rate of \(7000\) pencils per hour. If the two machines together must produce \(100,000\) pencils and if each machine can operate for at most \(8\) hours, what is the least amount of time, in hours, that machine \(B\) must operate?

A. \(4\)

B. \(4 \frac23\)

C. \(5\frac13\)

D. \(6\)

E. \(6 \frac14\)

Answer: A

Source: GMAT Paper Tests
Join the discussion
Source: — Problem Solving |

Gmat_mission wrote:
Sun Dec 12, 2021 1:42 am
Machine \(A\) produces pencils at a constant rate of \(9000\) pencils per hour, and machine \(B\) produces pencils at a constant rate of \(7000\) pencils per hour. If the two machines together must produce \(100,000\) pencils and if each machine can operate for at most \(8\) hours, what is the least amount of time, in hours, that machine \(B\) must operate?

A. \(4\)

B. \(4 \frac23\)

C. \(5\frac13\)

D. \(6\)

E. \(6 \frac14\)

Answer: A

Source: GMAT Paper Tests
To MINIMIZE machine B's operating time, we must MAXIMIZE the time machine A's operating time.
So, let machine A operate for the full 8 hours.
In 8 hours, machine A produces 72,000 pencils [8 hours x 9,000 pencils/hour =72,000 pencils]

So, the number of pencils machine B must make = 100,000 - 72,000 = 28,000

Time = output/rate
So, operating time = 28,000/7000 = 4 hours

Answer: A

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion