Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Machine A produces bolts at a uniform rate of 120 every 40

Expert replies
by AAPL » Wed Jul 04, 2018 8:18 am
Timer
00:00
Your answer
Difficulty–

right wrong

Pick an answer to see how members did

Machine A produces bolts at a uniform rate of 120 every 40 seconds, and Machine B produces bolts at a uniform rate of 100 every 20 seconds. If the two machines run simultaneously, how many seconds will it take for them to produce a total of 200 bolts?

A. 22
B. 25
C. 28
D. 32
E. 56

The OA is B.

Is there a strategic approach to solve this question? Can anyone help? Thanks!
Join the discussion
Source: — Problem Solving |

by [email protected] » Wed Jul 04, 2018 1:31 pm
Hi All,

We're told that Machine A produces bolts at a uniform rate of 120 every 40 seconds and Machine B produces bolts at a uniform rate of 100 every 20 seconds. We're asked if the two machines run simultaneously, how many seconds will it take for them to produce a total of 200 bolts. The 'math' behind this question can be approached in a number of different ways. Since the Machines produce bolts in 'nice, round' numbers, we can calculate the number of bolts that each machine produces per second.

Machine A produces 120 bolts every 40 seconds, so that's 120/40 = 3 bolts/second.
Machine A produces 100 bolts every 20 seconds, so that's 100/20 = 5 bolts/second.
Total = 8 bolts/second

The time it would take to produce 200 bolts would be 200/8 = 25 seconds.

Final Answer: B

GMAT assassins aren't born, they're made,
Rich
Contact Rich at [email protected]
Image
Join the discussion

by Scott@TargetTestPrep » Sun Jul 22, 2018 5:42 pm
AAPL wrote:Machine A produces bolts at a uniform rate of 120 every 40 seconds, and Machine B produces bolts at a uniform rate of 100 every 20 seconds. If the two machines run simultaneously, how many seconds will it take for them to produce a total of 200 bolts?

A. 22
B. 25
C. 28
D. 32
E. 56
We are given that machine A produces bolts at a uniform rate of 120 every 40 seconds. Thus, the rate of Machine A is 120/40 = 3 bolts/second.

We are also given that Machine B produces bolts at a uniform rate of 100 every 20 seconds. Thus, the rate of Machine B is 100/20 = 5 bolts/second.

We need to determine the time it will take to produce 200 bolts when the two machines run simultaneously.

To determine the time to produce 200 bolts, we can use the combined work formula:

Work by Machine A + Work by Machine B = 200 bolts (the total work completed).

Because both machines are working simultaneously, we can say that they both work together for t seconds. We now can express the individual work done by Machine A and by Machine B. We must remember that work = rate x time.

Work done by Machine A = 3t

Work done by Machine B = 5t

3t + 5t = 200

8t = 200

t = 200/8 = 25

Alternate Solution:

Since Machine A produces 120 bolts every 40 seconds, it will produce 60 bolts every 20 seconds. Combined with Machine B, the two machines will produce 100 + 60 = 160 bolts every 20 seconds. To find the time it will take the two machines to produce 200 bolts, we can set up a simple proportion: “160 bolts is to 20 seconds as 200 bolts is to t seconds”

160/20 = 200/t

t = (200 x 20)/160 = 25 seconds

Answer: B

Scott Woodbury-Stewart