BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Machine A can produce balls at a constant rate of 2 balls pe

Expert replies
by Max@Math Revolution » Tue Mar 20, 2018 12:41 am
[GMAT math practice question]

Machine A can produce balls at a constant rate of 2 balls per hour, and machine B can produce balls at a constant rate of 3 balls per hour. If at least one of machine A and machine B produces balls at any time, what is the smallest possible number of hours that machine A and machine B must work together at their constant rates to produce 70 balls in 20 hours?

A. 5hrs
B. 6hrs
C. 7hrs
D. 8hrs
E. 9hrs
Join the discussion
Source: — Problem Solving |

by GMATGuruNY » Tue Mar 20, 2018 4:53 am
I believe that the following reflects the intent of the problem.
Machine A produces balls at a constant rate of 2 balls per hour, and machine B produces balls at a constant rate of 3 balls per hour. 70 balls must be produced over the next 20 hours. If at least one of the two machines works at all times, what is the least number of hours that the two machines must work together?

A. 5hrs
B. 6hrs
C. 7hrs
D. 8hrs
E. 9hrs
Since A's rate = 2 balls per hour and B's rate = 3 balls per hour, the combined rate for A+B working together = 5 balls per hour.
We can PLUG IN THE ANSWERS, which represent the number of hours A and B work together.
Since the question stem asks for the LEAST number of hours, start with the smallest answer choice.
To MINIMIZE the number of hours that the two machines work together, we must MAXIMIZE the rate when only ONE machine works.
Since B is faster than A, the machine working at all times must be B.
When the correct answer is plugged in, 70 balls will be produced in 20 hours.

A: 5 hours for A+B together, implying 15 hours for B alone, for a total of 20 work-hours
Since A+B produce 5 balls per hour, the number of balls produced by A+B in 5 hours = rt = 5*5 = 25 balls.
Since B produces 3 balls per hour, the number of balls produced by B in 15 hours = rt = 3*15 = 45.
Total balls produced = 25+45 = 70.
Success!

The correct answer is A.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by Max@Math Revolution » Wed Mar 21, 2018 11:45 pm
=>

Since machine B has the faster working rate, it must work for the entire period to minimize the number of hours that machine A has to work.
When machine B works for 20 hours, it produces 60 balls. This means that machine A must produce 70 - 60 = 10 balls, and it must work for 5 hours, since the work rate of machine A is 2 balls per hour.

Therefore, the answer is A.

Answer: A
Join the discussion

by Jeff@TargetTestPrep » Thu Mar 22, 2018 2:52 pm
Max@Math Revolution wrote:[GMAT math practice question]

Machine A can produce balls at a constant rate of 2 balls per hour, and machine B can produce balls at a constant rate of 3 balls per hour. If at least one of machine A and machine B produces balls at any time, what is the smallest possible number of hours that machine A and machine B must work together at their constant rates to produce 70 balls in 20 hours?

A. 5hrs
B. 6hrs
C. 7hrs
D. 8hrs
E. 9hrs
To minimize the time both the machines are working together, we must maximize the time that the faster of the two machines, machine B, works alone. Let's assume that machine B works for the entire 20 hours, producing 20 x 3 = 60 balls. The remaining 70 - 60 = 10 balls must be produced by machine A, and it will take 10 / 2 = 5 hours for machine A to produce them. Thus, the two machines must work for a minimum of 5 hours together.

Answer: A

Jeffrey Miller
Head of GMAT Instruction
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews
Join the discussion