BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Machine A and Machine B - Problem Solving

Expert replies
by Fdelpesce » Sun Jan 13, 2013 10:52 am
Could someone explain how to do this problem below? When I originally attempted it, the formula that ran through my head was a x b/a + b. But do you not use that because it is not asking for the combined total rate?

Machine A, working alone at a constant rate, can complete a certain production lot in x hours. Machine B, working alone at a constant rate, can complete 1/5 of the same production lot in y hours. Machines A and B, working together, can complete 1/2 of the same production lot in z hours. What is the value of y in terms of x and z?

A. 5x-10z/2xz
B. 2xz/5x-10z
C. 5xz/x+z
D. xz/x+z
E. xz/x+2z


Thank you!
Join the discussion
Source: — Problem Solving |

by Brent@GMATPrepNow » Sun Jan 13, 2013 11:52 am
Fdelpesce wrote:Could someone explain how to do this problem below? When I originally attempted it, the formula that ran through my head was a x b/a + b. But do you not use that because it is not asking for the combined total rate?

Machine A, working alone at a constant rate, can complete a certain production lot in x hours. Machine B, working alone at a constant rate, can complete 1/5 of the same production lot in y hours. Machines A and B, working together, can complete 1/2 of the same production lot in z hours. What is the value of y in terms of x and z?

A. 5x-10z/2xz
B. 2xz/5x-10z
C. 5xz/x+z
D. xz/x+z
E. xz/x+2z
Here's the algebraic solution:

Determine the rates per hour.

Rate = output/time

Machine A, working alone at a constant rate, can complete a certain production lot in x hours.
Output = 1 lot
Time = x hours
So, hourly rate = 1/x lots per hour

Machine B, working alone at a constant rate, can complete 1/5 of the same production lot in y hours.
Output = 1/5 lots
Time = y hours
So, hourly rate = (1/5)/y lots per hour
= 1/(5y) lots per hour

Machines A and B, working together, can complete 1/2 of the same production lot in z hours.
Output = 1/2 lots
Time = z hours
So, hourly rate = (1/2)/z lots per hour
= 1/(2z) lots per hour

IMPORTANT: the hourly rate for machine A + the hourly rate for machine B = combined hourly rate for A and B
So, 1/x + 1/(5y) = 1/(2z) . . . solve for y
Multiply both sides by 10xyz to get: 10yz + 2xz = 5xy
Rearrange to get: 2xz = 5xy - 10yz
Factor right side to get: 2xz = y(5x - 10z)
Isolate y to get: 2xz/(5x - 10z) = y

Answer = B

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by GMATGuruNY » Sun Jan 13, 2013 1:27 pm
Fdelpesce wrote:Could someone explain how to do this problem below? When I originally attempted it, the formula that ran through my head was a x b/a + b. But do you not use that because it is not asking for the combined total rate?

Machine A, working alone at a constant rate, can complete a certain production lot in x hours. Machine B, working alone at a constant rate, can complete 1/5 of the same production lot in y hours. Machines A and B, working together, can complete 1/2 of the same production lot in z hours. What is the value of y in terms of x and z?

A. 5x-10z/2xz
B. 2xz/5x-10z
C. 5xz/x+z
D. xz/x+z
E. xz/x+2z

Thank you!
Let the lot = 20 units.

Let x = 5 hours.
Rate for A alone = w/t = 20/5 = 4 units per hour.

Let y = 4 hours.
This is the time for B to produce 1/5 of the lot (4 units).
Thus, B's rate = w/t = 4/4 = 1 unit per hour.

Half of the lot = 10 units.
Combined rate for A+B = 4+1 = 5 units per hour.
z = the time for A+B to produce 1/2 of the lot = w/r = 10/5 = 2 hours.

The question asks for the value of y (4 hours). This is our target.
Now we plug x=5 and z=2 into the answers to see which yields our target of 4.
Only answer choice B works:
2xz/5x-10z = (2*5*2)/(5*5 - 10*2) = 20/5 = 4.

The correct answer is B.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by Fdelpesce » Sun Jan 13, 2013 2:54 pm
Why is it that you multiple both sides by 10xyz?[/quote]
Join the discussion

by alexander.vien » Tue Jan 29, 2013 1:06 pm
That's the common denominator of all the terms. When you have a bunch of fractions on one side of an equation an easy way to simplify is to multiply both sides by the product of all the denominators, which in this case would be 10xyz.
Join the discussion

by chiccufrazer » Sat Feb 02, 2013 3:41 pm
Aha so this is not a hard problem at all..ok
Join the discussion

by Tommy Wallach » Sat Feb 02, 2013 6:22 pm
Hey Chiccufrazer,

Actually this would certainly be considered a hard question (7-800). Most GMAT explanations look very straightforward in retrospect, but both plugging in and algebra here are pretty time-consuming, with lots of steps where one could make a mistake.