The prompt should read as follows:
BTGmoderatorDC wrote:Working together at their respective constant rates, Machine A and Machine B can produce 1,200 units in 8 hours. Working alone, Machine B would complete that same output in 50% more time. If Machine A were to work on its own for an 8-hour shift, APPROXIMATELY what percent of the 1,200 unit total would it produce?
A. 25
B. 33
C. 50
D. 67
E. 75
Since A+B take 8 hours to produce 1200 units, the combined rate for A+B = w/t = 1200/8 =
150 units per hour.
Since B take 50% more time than the 8 hours required when A+B work together, B's time = 8 + (50% of 8) = 8 + 4 = 12 hours.
Since B takes 12 hours to produce 1200 units, B's rate alone = w/t = 1200/12 = 100 units per hour.
Thus, A's rate alone = (combined rate for A+B) - (B's rate alone) = 150 - 100 =
50 units per hour.
The two rates in blue indicate the following:
Of the 150 units produced by A+B each hour, 50 units are produced by A, implying that (A's work)/(total work) = 50/150 = 1/3 ≈ 33.33%.
The correct answer is
B.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.
As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.
For more information, please email me (Mitch Hunt) at
[email protected].
Student Review #1
Student Review #2
Student Review #3