Q:If 20 engineers and 20 workers can together construct a 20km road in 20 days , then 40 engineers and 40 workers together construct 40km road in how many days ?
Ans.20 days. The answer is correct. I have some confusion regarding the solution. The solution is given as 20 X 20 = 400 man days for 20km road.
i.e workers(20) X days(20) = 400 man-days , so for 40km road: 800 man-days are required. therefore 800/40 = 20 man-days.
My question is why are we multiplying only Workers(20) X Days(20) and not :
Engineers(20) X Workers(20) X Days (20) = 8000 man-days to determine the man days ? Why are we leaving out the engineers from the man-days calculation ?
Maybe I am missing some very simple concept!
Ans.20 days. The answer is correct. I have some confusion regarding the solution. The solution is given as 20 X 20 = 400 man days for 20km road.
i.e workers(20) X days(20) = 400 man-days , so for 40km road: 800 man-days are required. therefore 800/40 = 20 man-days.
My question is why are we multiplying only Workers(20) X Days(20) and not :
Engineers(20) X Workers(20) X Days (20) = 8000 man-days to determine the man days ? Why are we leaving out the engineers from the man-days calculation ?
Maybe I am missing some very simple concept!