- sanju09
- GMAT Instructor
- Posts: 3650
- Joined: Wed Jan 21, 2009 4:27 am
- Location: India
- Thanked: 267 times
- Followed by:80 members
- GMAT Score:760
A computer chip manufacturer expects the ratio of the number of defective chips to the total number of chips in all future shipments to equal the corresponding ratio for shipments S1, S2, S3 and S4 combined, as shown in the following table (read in order). What is the expected number of defective chips in a shipment of 60,000 chips?
Shipment: S1 S2 S3 S4
Number of defective chips in the shipment: 2 5 6 4
Total number of chips in the shipment: 5,000 12,000 18,000 16,000
A. 14
B. 20
C. 22
D. 24
E. 25
OA B
Shipment: S1 S2 S3 S4
Number of defective chips in the shipment: 2 5 6 4
Total number of chips in the shipment: 5,000 12,000 18,000 16,000
A. 14
B. 20
C. 22
D. 24
E. 25
OA B
The mind is everything. What you think you become. -Lord Buddha
Sanjeev K Saxena
Quantitative Instructor
The Princeton Review - Manya Abroad
Lucknow-226001
www.manyagroup.com
Sanjeev K Saxena
Quantitative Instructor
The Princeton Review - Manya Abroad
Lucknow-226001
www.manyagroup.com
















