BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Hard Work Problem

Expert replies
by rtaha2412 » Fri Nov 05, 2010 12:57 pm
Thanks for the help. I am stumped on this.

If 6 machines run at the same constant rate, they can complete a job in 8 hours. If only 5 of these machines run at this rate, how many more minutes will be required to complete the same job?

a 38
b 72
c 80
d 90
e 96
Join the discussion
Source: — Problem Solving |

by nadcreutz » Fri Nov 05, 2010 1:11 pm
Hey,

I believe the correct answer is c=80

It takes 6 machines 480min (8hrs*60min*6machines) to complete the job, which is 80 minutes per machine. Divide 480 by 5 machines, so it takes 5 machines 96 minutes per machine to complete the same job. That is 16 minutes per machine longer, so multiply this difference by 5 and you get 80 minutes.
Join the discussion

by goyalsau » Fri Nov 05, 2010 7:50 pm
nadcreutz wrote:Hey,

I believe the correct answer is c=80

It takes 6 machines 480min (8hrs*60min*6machines) to complete the job, which is 80 minutes per machine. Divide 480 by 5 machines, so it takes 5 machines 96 minutes per machine to complete the same job. That is 16 minutes per machine longer, so multiply this difference by 5 and you get 80 minutes.

I thought all the 6 machines are working for 8 hours simultaneously

I am getting the answer as 96

What is the OA?
Saurabh Goyal
[email protected]
-------------------------


EveryBody Wants to Win But Nobody wants to prepare for Win.
Join the discussion

by diebeatsthegmat » Sun Nov 07, 2010 12:28 pm
goyalsau wrote:
nadcreutz wrote:Hey,

I believe the correct answer is c=80

It takes 6 machines 480min (8hrs*60min*6machines) to complete the job, which is 80 minutes per machine. Divide 480 by 5 machines, so it takes 5 machines 96 minutes per machine to complete the same job. That is 16 minutes per machine longer, so multiply this difference by 5 and you get 80 minutes.

I thought all the 6 machines are working for 8 hours simultaneously

I am getting the answer as 96

What is the OA?
yeah you right, the answer must be 96...
6 machines work 480 minutes to finish the job ( at constant speed) so each machine works 80 minutes,
1 machine left thus only 5 machines work, they will have to do the job of the left machine thus 80/5=16
so each machine work more than 16 minutes ,,,,
Join the discussion

by GMATGuruNY » Mon Nov 08, 2010 4:17 am
rtaha2412 wrote:Thanks for the help. I am stumped on this.

If 6 machines run at the same constant rate, they can complete a job in 8 hours. If only 5 of these machines run at this rate, how many more minutes will be required to complete the same job?

a 38
b 72
c 80
d 90
e 96
An easy approach is to plug in a value for the work being completed by each machine.

Plug in that each machine completes 1 unit/hour.
Rate for 6 machines = 6*1 = 6 units/hour.
In 8 hours, r*t = 6*8 = 48 units are completed. This is the value of the job.
Rate for 5 machines = 5*1 = 5 units/hour.
Time for 5 machines = w/r = 48/5 = 9.6 hours
Additional time needed = 9.6 - 8 = 1.6 hours = 96 minutes.

The correct answer is E.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by sbeagol1000 » Mon Mar 18, 2013 12:40 pm
I got E.

1 job/8 hours/6 machines = 1/48 or 48 hours

For 5 machines to do the same job requires 48hours/5machines = 9.6hrs

9.6hrs - 8 hrs = 1.6hrs

1.6hrs(60min) = 96 min
Join the discussion

by killerdrummer » Tue Mar 19, 2013 7:48 am
its E option 96 minutes

let us assume rate /day for each machine as r

Six machines for 8 days = 6r x 8 = 48r

now when same work i.e 48r has to be done with 5 machines it will be 48r/5r = 9.6 hours = (8 + 1.6) hours

1.6 hours equals 96 minutes.

I Hope it was clear!

---
KD
Join the discussion

by rairavig » Thu Mar 21, 2013 12:39 am
assume total work to be done = 8 units
done by 6 machines in 8 hours
each machine has contibutued in 8 hours = 8 units / 6
= 1.33 Units

5 machines will do in 8 hours 1.33 x 5 = 6.65 units .... (1)
total work is 8 units so teh work left to be done = 8 - 6.65 = 1.35 units .....(2)

from (1)..
1 hours efficiency of 5 machines = 6.65 / 8
= 0.831

number of hours taken to finish left 1.35 units work by 5 machines = 1.35 / 0.831
= 1.6 Hours = 96 Minutes