Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Discussing work problems

Expert replies
by towerSpider » Fri Dec 17, 2010 3:01 pm
Any short method (just like stacey's for mixtures) for work problems. I mean one short formula that can work for all. They are hardest of all questions.

Questions of such type are like if three men can do a certain job in twelve hours, if two men are employed then how long will it take to do two third of job?
Join the discussion
Source: — Problem Solving |

by Night reader » Fri Dec 17, 2010 3:18 pm
towerSpider wrote:Any short method (just like stacey's for mixtures) for work problems. I mean one short formula that can work for all. They are hardest of all questions.

Questions of such type are like if three men can do a certain job in twelve hours, if two men are employed then how long will it take to do two third of job?
3 men => 1/12 (one-hour job)
2 men => x

x=2/12 : 3= 2/36 or 1/18 (one-hour job)

2 men => 1/18 (one-hour job) and 2/3 of job is Y hours => Y= 2/3 : 1/18 = 2/3 *18= 12 hours
Join the discussion

by GMATGuruNY » Sat Dec 18, 2010 5:29 am
towerSpider wrote:Any short method (just like stacey's for mixtures) for work problems. I mean one short formula that can work for all. They are hardest of all questions.

Questions of such type are like if three men can do a certain job in twelve hours, if two men are employed then how long will it take to do two third of job?
Approach #1:

When the job is undefined, we can plug in our own values.

Plug in rate for each man = 1/hour.
Rate for 3 men = 3/hour.
Work for 12 hours = r*t = 3*12 = 36. This is the value of the job.
2/3 of the job = (2/3)*36 = 24.
Rate for 2 men = 2/hour.
Time = w/r = 24/2 = 12 hours.

Approach #2:

(number of men) x (number of days) always has to yield the same amount of work.

So we could set up this equation:

(number of men) x (number of days) = (number of men) x (number of days)

3 * 12 = 2x
x = 18

Since 2 men would need 18 days to complete the whole job, (2/3)*18 = 12 days will be needed to complete 2/3 of the job.

In math terms, the number of men is inversely proportional to the number of days. When two values are inversely proportional, as one value goes down, the other must go up, so that their product is always the same. In the problem above, as the number of men goes down, the number of days must go up, so that the product of the 2 values stays the same and we're always getting the same amount of work done.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by beat_gmat_09 » Sat Dec 18, 2010 8:22 am
GMATGuruNY wrote: Approach #2:

(number of men) x (number of days) always has to yield the same amount of work.
Hi Guru,
This approach can be used when we are given that the rate for each entity is same, right ?
In this problem we have to assume this.
Please correct me if i am wrong.
Hope is the dream of a man awake
Join the discussion