BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Difficult Work/Rate Problem

Expert replies
by mattocks » Sun Mar 28, 2010 11:23 am
Can someone explain the best way to solve this problem?

13 men and 7 boys can finish a job in 7 days, while 6 boys and 13 women can finish the same job in 6 days. In how many days can 1 man, 1 boy and 1 woman working together finish the same job (assume constant rates each for men, women, and boys)?

a) 42
b) 54
c) 21
d) 63
e) 24
Join the discussion
Source: — Problem Solving |

by thephoenix » Sun Mar 28, 2010 8:47 pm
mattocks wrote:Can someone explain the best way to solve this problem?

13 men and 7 boys can finish a job in 7 days, while 6 boys and 13 women can finish the same job in 6 days. In how many days can 1 man, 1 boy and 1 woman working together finish the same job (assume constant rates each for men, women, and boys)?

a) 42
b) 54
c) 21
d) 63
e) 24
IMO A
Attachments
work time11.xls
(13.5 KiB) Downloaded 108 times
Join the discussion

by harshavardhanc » Mon Mar 29, 2010 2:50 am
mattocks wrote:Can someone explain the best way to solve this problem?

13 men and 7 boys can finish a job in 7 days, while 6 boys and 13 women can finish the same job in 6 days. In how many days can 1 man, 1 boy and 1 woman working together finish the same job (assume constant rates each for men, women, and boys)?

a) 42
b) 54
c) 21
d) 63
e) 24
13M + 7B = 1/7 (per day work of 13 men and 7 boys)
13W + 6B = 1/6 (per day work of 13 women and 6 boys)
------------------------------
13M+13W+13B = 13/42

per day work of (M+W+B) = 1/42. Hence, number of days required for 1 man, 1 woman, and 1 boy = 42 days.
Regards,
Harsha
Join the discussion

by pops » Mon Mar 29, 2010 6:42 am
mattocks wrote:Can someone explain the best way to solve this problem?

13 men and 7 boys can finish a job in 7 days, while 6 boys and 13 women can finish the same job in 6 days. In how many days can 1 man, 1 boy and 1 woman working together finish the same job (assume constant rates each for men, women, and boys)?

a) 42
b) 54
c) 21
d) 63
e) 24
Hi,
Trick here would be to notice the pattern of numbers : 13, 7, 6 ....
now make an equation as per given condition:
13 * 1/m + 7 * 1/b = 1/7
13 * 1/w + 6 * 1/b = 1/6

[quickly realise that 7/b + 6/b =13/b and we are asked to know 1/m+1/w+1/b]
so, add above 2:
13 * (1/m+1/w+1/b) = 1/7 + 1/6 = 13/42
hence, the answer = 42 :-)
Join the discussion

by eaakbari » Mon Mar 29, 2010 1:47 pm
Using information given form the equations

13/x + 7/y = 1/7
6/y +13/z = 1/6

Here we have 3 variables and 2 equations which is unsolvable, that means theres some trick, so observing the equations, we realize their sum gives us the answer

Answer A
Join the discussion

by akhpad » Tue Mar 30, 2010 1:35 am
7(13M+7B) = 6(6B+13W) = k(M+B+W)


(13M+7B) = k(M+B+W)/7
(6B+13W) = k(M+B+W)/6
sum these two

13M+13B+13W = k(M+B+W)(1/7 + 1/6)

k = 42
Join the discussion

by kstv » Tue Mar 30, 2010 8:31 am
pops wrote: Trick here would be to notice the pattern of numbers : 13, 7, 6 ....
now make an equation as per given condition:
13 * 1/m + 7 * 1/b = 1/7
13 * 1/w + 6 * 1/b = 1/6
[quickly realise that 7/b + 6/b =13/b and we are asked to know 1/m+1/w+1/b]
so, add above 2:
13 * (1/m+1/w+1/b) = 1/7 + 1/6 = 13/42
hence, the answer = 42 :-)
13 M + 7 B = 7 days ---1 and 6 B + 13 W = 6 days ----2
LCM of 7 and 6 = 42
13M+7B in 42 days can do 6 times the work ---1
......6B + 13 W in 42 days can do 7 times the work-------2 Adding 1 and 2
13M+13B+13W in 42 days can do 13 times the work so dividing by 13
M+B+W can in 42 days can do the the work once.
Join the discussion