- talaangoshtari
- Master | Next Rank: 500 Posts
- Posts: 154
- Joined: Wed May 21, 2014 4:29 am
- Thanked: 8 times
- Followed by:1 members
The constant rate at which machines A works is 3/4 of the constant rate at which machine B works. Under normal conditions, machine A would complete x lots in 2 days. However, when a technician attempts to use machines A and B simultaneously, there is not enough electrical power to run both machines at full power. As a result, running the machines simultaneously reduces the work rate of each machine by 20%.
How long will it take the machines to complete 3x lots, working simultaneously?
How long will it take the machines to complete 3x lots, working simultaneously?













