BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Basic question regarding work rate | Experts plz comment

Expert replies
by [email protected] » Fri Nov 11, 2016 12:37 am
Hi Experts,

Please help me with the understanding:

Is the rate derived for each correct in the table

A newer machine, working alone at its constant rate, can fill a production order in half the time required by two older machines working together at their constant rates. Then what will be the rate of each of the older machines.




Image
Join the discussion
Source: — Problem Solving |

by DavidG@VeritasPrep » Fri Nov 11, 2016 7:50 am
[email protected] wrote:Hi Experts,

Please help me with the understanding:

Is the rate derived for each correct in the table

A newer machine, working alone at its constant rate, can fill a production order in half the time required by two older machines working together at their constant rates. Then what will be the rate of each of the older machines.




Image
Well, the labels in your table are a little ambiguous, but your basic reasoning looks okay. (I'm assuming the (1/4t) refers to the rate for each old machine, not the rate for 2 old machines together.)

Another way to think about it: If a new machine can do a job in half the time that 2 old machines can do a job, then the new machine has a rate that is double the rate of two old machines working together.

Rate for a new machine: N

Rate for an old machine D

If N's rate is twice the rate of two D's working together then N = 2(D+D) or N =2(2D) or N = 4D or N/4 = D
Veritas Prep | GMAT Instructor

Veritas Prep Reviews
Save $100 off any live Veritas Prep GMAT Course
Join the discussion

by [email protected] » Fri Nov 11, 2016 9:27 am
Hi nishatfarhat87,

In these types of situations, instead of thinking 'algebraically', you might find it easier to come up with a simple example that you can use to define the relationships involved.

We're told that a newer machine can fill an order in HALF the time required by TWO older machines working together...

IF....
New Machine = fills order in 1 hour
TWO Old Machines = fill order in 2 hours

Since the two old machines are working together, each would fill HALF the job in 2 hours

ONE Old Machine = fills order in 4 hours

Now we have the relationship between one new machine and one old machine. One old machine takes 4 times as much time to complete the job as one new machine.

GMAT assassins aren't born, they're made,
Rich
Contact Rich at [email protected]
Image
Join the discussion

by Matt@VeritasPrep » Fri Nov 11, 2016 2:05 pm
Let's call the amount of work to be done W, the rate of the new machine R, and the rate of each old machine S. This gives us

New machine: W = RT

Old machines: W = 2S * 2T

So RT = 4ST, or R = 4S, and the new machine is four times as fast as one of the old machines.
Join the discussion