BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATBootcamp Starts Sep 21
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE BOOTCAMP

Live Online Bootcamp Class with Top GMAT Expert Chris Peckover

Sep 21 to Oct 9, 2026

Schedule
Mon to Fri · 7:00 to 10:00 PM ET
Included
Live classes + 6 months of TTP OnDemand
  • Boost your GMAT score in less than one month in a live online class
  • 6 months access to TTP OnDemand video courses included
View bootcamp & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

The Interstate Bridge over the Apache River

Expert replies
by BTGmoderatorDC » Sat Dec 16, 2017 1:39 am
The Interstate Bridge over the Apache River, built in the 1950s, shows a substantial amount of rust: as much as 45% of its surface is coated in rust. Community activists have argued that the bridge presents a hazard: it is likely to collapse in places where it has rusted through. Professors of mechanical engineering at the local university did an extensive analysis of the bridge. These professors and their graduate students determined that 98% of the rust on the bridge exists on the surface only, and actually seals the underlying steel from the corrosive influence of the elements. The results of this academic study suggest that the bridge is safe for continued use.

In the argument given, the two portions in boldface play which of the following roles?

(A) The first is evidence in support of the conclusion; the second is that conclusion.

(B)The first is the main conclusion of the argument; the second provides evidence that calls this conclusion into question.

(C) The first is evidence taken to support one conclusion; the second provides evidence that calls this conclusion into question.

(D) The first is a position that the argument opposes; the second is the conclusion of the argument.

(E) The first is an interpretation of evidence; the second calls that evidence into question.

Can some experts explain the best answer?

OA D
Join the discussion
Source: — Critical Reasoning |