BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Ami, Bhami and Chani started working on a project. All three of them working together take two hours to complete

Expert replies
by Mikrislac » Wed Jul 29, 2020 9:24 am

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty—

Ami, Bhami and Chani started working on a project. All three of them working together take two hours to complete the project. Chani individually takes four times the amount of time taken by Ami and Bhami working together. Ami takes half the amount of time that is taken by Bhami and Chani working together. What is the fractional amount of work that Bhami can complete in one hour?

A. 1/4
B. 1/5
C. 1/6
D. 1/12
E. 1/15
Join the discussion
Source: — Problem Solving |

Let the work efficiencies of the three people be A, B and C. Let the total amount of work be 200 units.

Then, A+B+C = 100 units/hour.

200/C = 4[200/(A+B)]

200/A = (1/2)*[200/(B+C)]

Solve for B. We get B = 40/3

Work done by B in one hour = 40/3 units.

Therefore, the required fractional amount of work that B can complete in one hour = (40/3)/200 = 1/15

Answer: E
Join the discussion

Mikrislac wrote: ↑
Wed Jul 29, 2020 9:24 am
Ami, Bhami and Chani started working on a project. All three of them working together take two hours to complete the project. Chani individually takes four times the amount of time taken by Ami and Bhami working together. Ami takes half the amount of time that is taken by Bhami and Chani working together. What is the fractional amount of work that Bhami can complete in one hour?

A. 1/4
B. 1/5
C. 1/6
D. 1/12
E. 1/15
Solution:

We can let the project = 60 (we choose the number 60 since it’s the least common denominator of all the denominators in the answer choice). We can let A, B, and C be the hourly rates of Ami, Bhami, and Chani, respectively. We can create the equations (recall that rate is inverse of time):

A + B + C = 60/2 → A + B + C = 30

C = ¼(A + B) → 4C = A + B

and

A = 2(B + C) → A = 2B + 2C

Substituting 4C for A + B in the first equation, we have:

4C + C = 30

5C = 30

C = 6

Substituting 2B + 2C for A in the first equation, we have:

2B + 2C + B + C = 30

3B + 3C = 30

B + C = 10

Since C = 6, we have:

B + 6 = 10

B = 4

Since the project is 60 and B’s hourly rate is 4, Bhami can complete the 4/60 = 1/15 of the project in one hour.

Answer: E

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion