Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

A piece of work can be done by 10 boys . . ..

Expert replies
by Vincen » Tue Dec 19, 2017 7:17 am
A piece of work can be done by 10 boys in 6 days working 4 hours each day. How many minimum possible number of boys are needed to complete another work which is three times more if they work for same integer number of hour and day, say x hour and x days?
(1) 5
(2) 10
(3) 12
(4) 15
(5) 30

The OA is option D.

I got confused here. I'd like the explanation of an expert. Thanks in advanced.
Join the discussion
Source: — Problem Solving |

by GMATWisdom » Fri Dec 22, 2017 11:39 am
Vincen wrote:A piece of work can be done by 10 boys in 6 days working 4 hours each day. How many minimum possible number of boys are needed to complete another work which is three times more if they work for same integer number of hour and day, say x hour and x days?
(1) 5
(2) 10
(3) 12
(4) 15
(5) 30

The OA is option D.

I got confused here. I'd like the explanation of an expert. Thanks in advanced.
If 10 boys can do a work in 6 days while working 4 hours a day
then one boy will do the same work in 10x6x4= 240 hours.

the new work is three times more
=> one boy will do three times more work in 240 + 240x3 =960 hours

further let Y be the minimum number of boys working x hours a day for x days to complete the new work
then Y = 960/x^2 or Y*x^2 = 960

now we have to find the maximum value of x which should be an integer so as to get the Y as an integer

that value we can find by making factors of 960 in the form Y*x^2
960 x 1^2
240 x 2^2
120 x 4^2
15 x 8^2
Thus the maximum value of x is 8 and the minimum value of Y is 15

Hence option (4) is correct.
Join the discussion

by Scott@TargetTestPrep » Sun Sep 08, 2019 10:02 am
Vincen wrote:A piece of work can be done by 10 boys in 6 days working 4 hours each day. How many minimum possible number of boys are needed to complete another work which is three times more if they work for same integer number of hour and day, say x hour and x days?
(1) 5
(2) 10
(3) 12
(4) 15
(5) 30

The OA is option D.

I got confused here. I'd like the explanation of an expert. Thanks in advanced.
Since 10 boys work for 6 days and 4 hours each day, the job requires 10 x 6 x 4 = 240 man-hours. Since the other job requires three times more time, it requires four times as much time, or a total of 240 x 4 = 960 man-hours. Now, if we let n = the number of boys needed to complete this job for x hours per day and x days, we have:

nx^2 = 960

Since n and x are positive integers and we want the minimum value of n, we need to maximize the value of x. So let’s factor 960:

960 = 16 x 60 = 4^2 x 4 x 15 = 4^2 x 2^2 x 15 = 8^2 x 15

We see that the largest perfect square that divides into 960 is 8^2, so x = 8, and hence, the minimum value of n must be 15.

Answer: D/4

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion