BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Work Rate Problem - 2

Expert replies
by saadishah » Tue Sep 27, 2016 10:42 am
Adam and Brianna plan to install a new tile floor in a classroom. Adam works at a constant rate of 50 tiles per hour, and Brianna works at a constant rate of 55 tiles per hour. If the new floor consists of exactly 1400 tiles, how long will it take Adam and Brianna working together to complete the classroom floor?

A. 26 hrs. 44 mins.
B. 26 hrs. 40 mins.
C. 13 hrs. 20 mins.
D. 13 hrs. 18 mins.
E. 12 hrs. 45 mins.

The solution to this problem came so easy that I feel like I am making some mistake :-)

Here is how I have solved it:

Combined Rate of A + B = 50 + 55 = 105
Total tiles = 1400
Time needed to finish 1400 tiles = 1400/105 = 13 hours and 35/105 minutes which simplifies to be 13 hours 20 minutes.

So option C.
Join the discussion
Source: — Problem Solving |

by Brent@GMATPrepNow » Tue Sep 27, 2016 12:51 pm
saadishah wrote:Adam and Brianna plan to install a new tile floor in a classroom. Adam works at a constant rate of 50 tiles per hour, and Brianna works at a constant rate of 55 tiles per hour. If the new floor consists of exactly 1400 tiles, how long will it take Adam and Brianna working together to complete the classroom floor?

A. 26 hrs. 44 mins.
B. 26 hrs. 40 mins.
C. 13 hrs. 20 mins.
D. 13 hrs. 18 mins.
E. 12 hrs. 45 mins.

The solution to this problem came so easy that I feel like I am making some mistake :-)

Here is how I have solved it:

Combined Rate of A + B = 50 + 55 = 105
Total tiles = 1400
Time needed to finish 1400 tiles = 1400/105 = 13 hours and 35/105 minutes which simplifies to be 13 hours 20 minutes.

So option C.
Your solution is perfect.
Answer: C

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by [email protected] » Wed Sep 28, 2016 9:59 am
Hi saadishah,

As you continue to study, you're going to find that many of the GMAT Quant questions that you face are actually fairly straight-forward. The "work" that you have to complete often takes just a minute (or less) and the rest of your time is spent reading, taking notes and deciding which approach will get you to the correct answer in the most efficient way. While 'word problems' will certainly take longer to read than other (less-wordy) Quant questions, that doesn't mean that they're necessarily going to be that difficult. So you should stay calm (regardless of how wordy the prompt is), take notes and do all of the work on the pad.

GMAT assassins aren't born, they're made,
Rich
Contact Rich at [email protected]
Image
Join the discussion

by Matt@VeritasPrep » Thu Sep 29, 2016 6:35 pm
Rule of thumb:

If you're working from a book, and a solution seems too easy to be right, there's a very good chance IT IS that easy and you're right.

If you're working from a CAT, and a solution seems too easy to be right, there's a very good chance IT IS NOT that easy and you're wrong.

This rule has saved me a lot of headache over the years ... but I still screw up anyway sometimes. :D