BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Seriously i dont get this qs

Expert replies
by candygal79 » Fri Apr 04, 2014 12:36 am
A metal company's old machine makes bolts a constant rate of 100 bolts per hour. The company's new machine makes bolts constant rate of 150 bolts per hour. If both machine start at the same time and continue making bolts simultaneously, how many MINUTES will it take the two machines to make a total of 300 bolts ?

A 36

B 72

C 120

D 144

E 180
Join the discussion
Source: — Problem Solving |

by GMATGuruNY » Fri Apr 04, 2014 2:18 am
candygal79 wrote:A metal company's old machine makes bolts a constant rate of 100 bolts per hour. The company's new machine makes bolts constant rate of 150 bolts per hour. If both machine start at the same time and continue making bolts simultaneously, how many MINUTES will it take the two machines to make a total of 300 bolts ?

A 36

B 72

C 120

D 144

E 180
Rates are ADDITIVE.
When the two machines work together, their combined rate = 100+150 = 250 bolts per hour.
Time for the two machines to produce 300 bolts = w/r = 300/250 = 6/5 hours.
Since 1 hour = 60 minutes, we multiply by 60 to convert hours to minutes:
(6/5) * 60 = 72 minutes.

The correct answer is B.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by [email protected] » Fri Apr 04, 2014 1:03 pm
Hi candygal79,

The answer choices to this question provide a fantastic shortcut.

With the two machines that we're given, we know that...

Old Machine = 100 bolts/hour
New Machine = 150 bolts/hour

If they start at the same time, the two machines will create 250 bolts/hour

The question asks how long it would take the two machines to make 300 bolts so we know it's going to be more than 1 hour.

If the two machines worked for 2 hours, then they'd make 500 bolts, but that's too many bolts.

We need an answer that's more than 1 hour, but less than 2 hours. The question also asks for an answer IN MINUTES. The ONLY answer that fits is the one that's between 60 minutes and 120 minutes.

Final Answer: B

GMAT assassins aren't born, they're made,
Rich
Contact Rich at [email protected]
Image
Join the discussion

by Scott@TargetTestPrep » Mon Feb 04, 2019 5:29 pm
candygal79 wrote:A metal company's old machine makes bolts a constant rate of 100 bolts per hour. The company's new machine makes bolts constant rate of 150 bolts per hour. If both machine start at the same time and continue making bolts simultaneously, how many MINUTES will it take the two machines to make a total of 300 bolts ?

A 36

B 72

C 120

D 144

E 180

We can let t = the number of hours to produce 300 bolts and create the equation:

(100 + 150) x t = 300

t = 300/250 = 6/5 hours, which is 72 minutes.

Alternate Solution:

We note that the two machines working together will produce 100 + 150 = 250 bolts in 60 minutes. Also, we notice that in 120 minutes, the two machines will produce 250 x 2 = 500 bolts. Since 300 is between 250 and 500, the time necessary for the two machines to produce 300 bolts must be between 60 and 120 minutes; the only possible choice is 72 minutes.

Answer: B