BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Three machines have equal constant work rates. It takes h +

Expert replies
by Max@Math Revolution » Sun Jan 13, 2019 11:53 pm

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty—

[Math Revolution GMAT math practice question]

Three machines have equal constant work rates. It takes h + 3 hours to produce 360 toys when 2 machines work together, and it takes h hours to produce 360 toys when 3 machines work together. How many toys can each machine produce per hour when working on its own?

A. 12
B. 15
C. 18
D. 20
E. 24
Join the discussion
Source: — Problem Solving |

by fskilnik@GMATH » Mon Jan 14, 2019 4:20 am
Max@Math Revolution wrote:[Math Revolution GMAT math practice question]

Three machines have equal constant work rates. It takes h + 3 hours to produce 360 toys when 2 machines work together, and it takes h hours to produce 360 toys when 3 machines work together. How many toys can each machine produce per hour when working on its own?

A. 12
B. 15
C. 18
D. 20
E. 24
$$1\,\,{\rm{mach}}\,\,\, \to \,\,\,{{?\,\,{\rm{toys}}} \over {1\,\,{\rm{hour}}}}$$
$$\left. \matrix{
2\,\,{\rm{mach}}\,\,\, \to \,\,\,{{360\,\,{\rm{toys}}} \over {h + 3\,\,{\rm{hours}}}}\,\,\,\,\,\,\, \Rightarrow \,\,\,\,\,\,1\,\,{\rm{mach}}\,\,\, \to \,\,\,{{180\,\,{\rm{toys}}} \over {h + 3\,\,{\rm{hours}}}}\,\,\,\, \hfill \cr
3\,\,{\rm{mach}}\,\,\, \to \,\,\,{{360\,\,{\rm{toys}}} \over {h\,\,{\rm{hours}}}}\,\,\,\,\,\,\, \Rightarrow \,\,\,\,\,\,1\,\,{\rm{mach}}\,\,\, \to \,\,\,{{120\,\,{\rm{toys}}} \over {h\,\,{\rm{hours}}}} \hfill \cr} \right\}\,\,\,\,\,\,\, \Rightarrow \,\,\,\,\,\,{{180} \over {h + 3}} = {{120} \over h}\,\,\,\,\,\, \Rightarrow \,\,\,\,\, \ldots \,\,\,\,\,\,\, \Rightarrow \,\,\,\,\,\,h = 6$$
$$1\,\,{\rm{mach}}\,\,\, \to \,\,\,{{120\,\,{\rm{toys}}} \over {h = 6\,\,{\rm{hours}}}} = {{20\,\,{\rm{toys}}} \over {1\,\,{\rm{hour}}}}\,\,\,\,\,\,\,\,\,\, \Rightarrow \,\,\,\,\,\,? = 20$$


This solution follows the notations and rationale taught in the GMATH method.

Regards,
Fabio.
Fabio Skilnik :: GMATH method creator ( Math for the GMAT)
English-speakers :: https://www.gmath.net
Portuguese-speakers :: https://www.gmath.com.br
Join the discussion

by GMATGuruNY » Mon Jan 14, 2019 4:54 am
Max@Math Revolution wrote:[Math Revolution GMAT math practice question]

Three machines have equal constant work rates. It takes h + 3 hours to produce 360 toys when 2 machines work together, and it takes h hours to produce 360 toys when 3 machines work together. How many toys can each machine produce per hour when working on its own?

A. 12
B. 15
C. 18
D. 20
E. 24
(number of machines)(number of hours) = number of toys that are produced.

In the prompt above, the blue values are THE SAME.
Implication:
2 machines take h+3 hours to produce the same number of toys as 3 machines in 2 hours:
2(h+3) = 3h
2h + 6 = 3h
6 = h.

Since 3 machines produce 360 toys in h=6 hours, the rate for 3 machines = 360/6 = 60 toys per hour.
Since the rate for 3 machines = 60 toys per hour, the rate for each machine = 60/3 = 20 toys per hour.

The correct answer is D.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by Brent@GMATPrepNow » Mon Jan 14, 2019 6:19 am
Max@Math Revolution wrote:Three machines have equal constant work rates. It takes h + 3 hours to produce 360 toys when 2 machines work together, and it takes h hours to produce 360 toys when 3 machines work together. How many toys can each machine produce per hour when working on its own?
A. 12
B. 15
C. 18
D. 20
E. 24
It takes h + 3 hours to produce 360 toys when 2 machines work together
So, during those h + 3 hours, EACH machine makes 180 toys
So, ONE machine can produce 180 toys in h + 3 hours
rate = output/time
So, we can write: rate of ONE machine = 180/(h + 3)

It takes h hours to produce 360 toys when 3 machines work together
So, during those h hours, EACH machine makes 120 toys
rate = output/time
So, we can write: rate of ONE machine = 120/h

How many toys can each machine produce per hour when working on its own?
Since we've written the rate of ONE machine in two ways, we can state the following:
180/(h + 3) = 120/h
Cross multiply to get: 180(h) = 120(h + 3)
Expand to get: to get: 180h = 120h + 360
Solve: h = 6

The first piece of information tells us that it takes h + 3 hours to produce 360 toys when 2 machines work together.
So, we now know that it takes 2 machines 6+3 hours to produce 360 toys
Simplify: it takes 2 machines 9 hours to produce 360 toys
This means it takes 1 machine 9 hours to produce 180 toys
So, 1 machine can produce 20 toys in 1 hour

Answer: D

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by Scott@TargetTestPrep » Mon Jan 14, 2019 5:43 pm
Max@Math Revolution wrote:[Math Revolution GMAT math practice question]

Three machines have equal constant work rates. It takes h + 3 hours to produce 360 toys when 2 machines work together, and it takes h hours to produce 360 toys when 3 machines work together. How many toys can each machine produce per hour when working on its own?

A. 12
B. 15
C. 18
D. 20
E. 24
Since it takes 2 machines h + 3 hours to make 360 toys, it takes 1 machine h + 3 hours to make 180 toys for a rate of 180/(h + 3).

Since it takes 3 machines h hours to produce 360 toys, it takes 1 machine h hours to make 120 toys for a rate of 120/h.

Setting our two rates equal we have:

180/(h + 3) = 120/h

180h = 120(h + 3)

180h = 120h + 360

60h = 360

h = 6

Thus, each machine can produce 120/6 = 20 toys per hour.

Answer: D

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion

by Max@Math Revolution » Wed Jan 16, 2019 12:02 am
=>

The work rate for each machine is given by 360 / {2(h+3)} = 180 / ( h + 3 ). Another expression for this work rate is 360 / (3h) = 120 / h.
Thus, 180 / ( h + 3 ) = 120 / h or 3 / ( h + 3 ) = 2 / h.
So, 3h = 2(h+3) and h = 6.
The sum of the work rates of the 3 machines is 360 / 6 = 60.
The work rate of each machine is 60/3 = 20 toys / hour.

Therefore, the answer is D.
Answer: D
Join the discussion