BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

If Machine B and Machine C work together at their constant

Expert replies
by BTGmoderatorDC » Mon Oct 22, 2018 10:40 pm

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty—

If Machine B and Machine C work together at their constant individual rates to produce x widgets, what percent of the widgets will be produced by Machine B?

(1) Machine A and Machine B, working together at their constant individual rates, can produce x widgets in 9 hours.

(2) Machine A and Machine C, working together at their constant individual rates, can produce x widgets in 12 hours.

OA E

Source: Veritas Prep
Join the discussion
Source: — Data Sufficiency |

by ceilidh.erickson » Tue Oct 23, 2018 9:13 am
Machines working together will work at the SUM of their individual rates. Since the question is asking us for the proportion of the work that Machine B completed, we would need to know the proportion that A & C together completed.

(1) Machine A and Machine B, working together at their constant individual rates, can produce x widgets in 9 hours.
Since we don't know how long it took at 3 machines to make x widgets working all together, it doesn't help us to know how long it took A and B together. There's no way to distinguish which portion of this was Machine B alone. Insufficient.

(2) Machine A and Machine C, working together at their constant individual rates, can produce x widgets in 12 hours.
If we knew how long all 3 of them spent together to make x widgets, this would be helpful. But since we don't have that information, we don't know if 12 hrs is way longer or just slightly longer than all 3 working together. This won't help us to determine the proportion of the total that B did. Insufficient.

(1) & (2) Together
Even with both pieces of information together, we don't have enough. What if Machine A is so slow that it effectively does almost nothing, so B does the whole job in almost 9 hrs and C does the whole job in almost 12 hrs? Or maybe C does almost nothing, A does it alone in almost 12 hrs, so B makes up whatever that difference is? In those 2 cases, Machine B would account for different proportions of the total. Insufficient.

The answer is E.
Ceilidh Erickson
EdM in Mind, Brain, and Education
Harvard Graduate School of Education
Join the discussion

BTGmoderatorDC wrote:If Machine B and Machine C work together at their constant individual rates to produce x widgets, what percent of the widgets will be produced by Machine B?

(1) Machine A and Machine B, working together at their constant individual rates, can produce x widgets in 9 hours.

(2) Machine A and Machine C, working together at their constant individual rates, can produce x widgets in 12 hours.

Source: Veritas Prep
\[?\,\,\,:\,\,\,{\text{in}}\,\,B \cup C\,\,\left( {{\text{any}}} \right)\,\,{\text{widget}}\,\,{\text{production}}\,,\,\,{\text{% }}\,\,{\text{done}}\,\,{\text{by}}\,\,{\text{B}}\]
Let´s present a BIFURCATION for (1+2), that is, two EXPLICIT VIABLE scenarios, each one giving a different answer to our FOCUS!

One possible scenario is the following:
A does x/2 widgets in 9 hours (hence x/6 in 3 hours and 2x/3 in 12 hours) , B does x/2 widgets in 9 hours and C does x/3 widgets in 12 hours.

Conclusion: in 12h, B does 2x/3 widgets and C does x/3 widgets , hence our FOCUS is 2x/3 divided by x , that is , 2/3.

Another possible scenario is the following:
A does x/4 widgets in 9 hours (hence x/12 in 3 hours and x/3 in 12 hours) , B does 3x/4 widgets in 9 hours (hence x widgets in 12h) and C does 2x/3 widgets in 12 hours.

Conclusion: in 12h, B does x widgets and C does 2x/3 widgets , hence our FOCUS is x divided by (x+2x/3 = 5x/3), that is 3/5 (NOT equal to 2/3).

The correct answer is therefore (E).


This solution follows the notations and rationale taught in the GMATH method.

Regards,
Fabio.
Fabio Skilnik :: GMATH method creator ( Math for the GMAT)