BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Two gardeners, Burton and Philips

Expert replies
by Uva@90 » Tue Aug 04, 2015 8:15 am
Two gardeners, Burton and Philips, work at independent constant rates to prune a garden full of roses. If both gardeners start at the same time and work at their normal rates, they will complete the job in 45 minutes. However, if Philips were to work at twice Burton's rate, they would take only 20 minutes. How long would it take Philip, working alone at his normal rate , to tune the garden full of roses.

A) 1 hour and 20 minutes
B) 1 Hour and 45 Min
C) 2 Hour
D) 2 hour and 20 Min
E) 3 Hour

OA E
Known is a drop Unknown is an Ocean
Join the discussion
Source: — Problem Solving |

by GMATGuruNY » Tue Aug 04, 2015 8:41 am
Uva@90 wrote:Two gardeners, Burton and Philips, work at independent constant rates to prune a garden full of roses. If both gardeners start at the same time and work at their normal rates, they will complete the job in 45 minutes. However, if Philips were to work at twice Burton's rate, they would take only 20 minutes. How long would it take Philip, working alone at his normal rate , to tune the garden full of roses.

A) 1 hour and 20 minutes
B) 1 Hour and 45 Min
C) 2 Hour
D) 2 hour and 20 Min
E) 3 Hour
Let the job = the LCM of 20 and 45 = 180 units.

If both gardeners start at the same time and work at their normal rates, they will complete the job in 45 minutes.
Since the time for Burton and Philip together is 45 minutes, the combined normal rate for Burton and Philip = w/t = 180/45 = 4 units per minute.

If Philip were to work at twice Burton's rate, they would take only 20 minutes.
Here, the combined faster rate for Burton and Philip = w/t = 180/20 = 9 units per minute.
Let B = Burton's rate.
When Philip works at twice Burton's rate, Philip's faster rate = 2B.
Implication:
Here, the combined faster rate for Burton and Philip = B + 2B = 3B.
Since the combined faster rate is 9 units per minute, we get:
3B = 9
B = 3 units per minute.

Since the combined normal rate for Burton and Philip = 4 units per minute, and Burton's rate alone = 3 units per minute, Philip's normal rate alone = 4-3 = 1 unit per minute.
Thus:
At his normal rate of 1 unit per minute, the time for Philip to produce 180 units = w/r = 180/1 = 180 minutes = 3 hours.

The correct answer is E.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by OptimusPrep » Tue Aug 04, 2015 7:51 pm
As Mitch explained, the best way to do such problems is to assume the total work as the LCM for the rates. This simplifies the calculations.

Another way can be:

Let the time required by Philips and Burton be P and B minutes

So,

1/P + 1/B = 1/45
and 2/B + 1/B = 1/20 (Since it is given that Philips works at twice Burton's rate)

On solving, 3/B = 1/20 or B = 60

Putting this in equation 1, we get

1/P = 1/45 - 1/60
1/P = (4 - 3)/15*3*4

or P = 180 = 3 hours.

Hence the answer is E
Join the discussion

by fskilnik@GMATH » Sun Sep 16, 2018 6:54 pm
Uva@90 wrote:Two gardeners, Burton and Philips, work at independent constant rates to prune a garden full of roses. If both gardeners start at the same time and work TOGETHER at their normal rates, they will complete the job in 45 minutes. However, if Philips were to work at twice Burton's rate, TOGETHER they would take only 20 minutes. How long would it take Philip, working alone at his normal rate , to tune the garden full of roses?

A) 1 hour and 20 minutes
B) 1 Hour and 45 Min
C) 2 Hour
D) 2 hour and 20 Min
E) 3 Hour
Prune a garden full of roses = 1 job

Burton takes (say) 2x minutes to do 1 job alone.

If Philip takes x minutes to do 1 job alone (to work at twice Burton's rate), together they would do the job in 20min, hence:
\[ \frac{1}{{20}} = \frac{1}{{2x}} + \frac{{1 \cdot \boxed2}}{{x \cdot \boxed2}} = \frac{3}{{2x}}\,\,\,\,\, \Rightarrow \,\,\,x = 30\,\,\,\left[ {\min } \right] \]
Conclusion: Burton takes 2x = 60 minutes to do this job alone.

If Philip takes y minutes to do 1 job alone (our FOCUS!), from the fact that together they would do it in 45min, we have:
\[ \frac{1}{{45}} = \frac{1}{{60}} + \frac{1}{y}\,\,\,\,\, \Rightarrow \,\,\,\frac{1}{y} = \frac{{1 \cdot \boxed4}}{{3 \cdot 15 \cdot \boxed4}} - \frac{{1 \cdot \boxed3}}{{4 \cdot 15 \cdot \boxed3}} = \,\,\frac{1}{{3 \cdot 4 \cdot 15}}\,\,\,\,\left[ {\frac{1}{{\min }}} \right] \]
\[? = y = 3 \cdot 60\,\,\min = 3{\text{h}}\]

This solution follows the notations and rationale taught in the GMATH method.

Regards,
Fabio.
Fabio Skilnik :: GMATH method creator ( Math for the GMAT)
English-speakers :: https://www.gmath.net
Portuguese-speakers :: https://www.gmath.com.br
Join the discussion

by [email protected] » Mon Sep 17, 2018 3:22 pm
Hi All,

We're told that two gardeners, Burton and Philips, work at independent constant rates to prune a garden full of roses. If both gardeners start at the same time and work at their normal rates, they will complete the job in 45 minutes. However, if Philips were to work at TWICE Burton's rate, they would take only 20 minutes. We're asked how long it would take Philip, working alone at his normal rate , to tune the garden full of roses. This question can be solved using the Work Formula, but it comes with a 'twist' that requires some extra math.

Work Formula = (A)(B)/(A+B) where A and B are the individual times it takes the two workers to complete the task alone. For this question, I'm going to use B and P for the two variables.

(B)(P)/(B+P) = 45 minutes
(B)P) = 45B + 45P

For the second equation, we're told that if Philips worked at TWICE Burton's rate, the total time would be 20 minutes. With Work Formula questions, the 'twist' is that if you DOUBLE a rate, you actually have to HALVE the number (since it actually takes HALF the time to do the job). Thus, instead of using "P", we're going to us "B/2" (since B/2 would be TWICE Burton's rate when using the Work Formula equation).

(B/2)(B)/(B/2 + B) = 20 minutes
B^2/2 = 10B + 20B
B^2/2 = 30B
B^2 = 60B
B^2 - 60B = 0
B(B - 60) = 0
B = 0, 60

Since the rate CANNOT be 0, we know that Burton's normal rate is 60 minutes to do the job alone. To find Phillip's rate, we have to plug B=60 back into the first equation:

(60)(P)/(60 + P) = 45
60P = 45(60+P)
60P = 2700 + 45P
15P = 2700
P = 180

Phillip's normal rate is 180 minutes to do the job alone.

Final Answer: E

GMAT assassins aren't born, they're made,
Rich
Contact Rich at [email protected]
Image
Join the discussion

by Scott@TargetTestPrep » Tue Sep 18, 2018 5:42 pm
Uva@90 wrote:Two gardeners, Burton and Philips, work at independent constant rates to prune a garden full of roses. If both gardeners start at the same time and work at their normal rates, they will complete the job in 45 minutes. However, if Philips were to work at twice Burton's rate, they would take only 20 minutes. How long would it take Philip, working alone at his normal rate , to tune the garden full of roses.

A) 1 hour and 20 minutes
B) 1 Hour and 45 Min
C) 2 Hour
D) 2 hour and 20 Min
E) 3 Hour
Let's let B = the number of minutes for Burton to do the job alone. Thus, Burton's rate is 1/B. We also let P = the number of minutes for Philip to do the job alone; his rate is 1/P. Since they are working together, we can combine their rates and create the following equation:
1/B + 1/P = 1/45

If Philip were to work at twice Burton's rate, his new rate would be 2/B, and we would have:

2/B + 1/B = 1/20

3/B = 1/20

60 = B

Substituting, we have:

1/60 + 1/P = 1/45

Multiplying by 180P, we have:

3P + 180 = 4P

180 = P

Thus, it will take Philip 180 minutes, or 3 hours, to prune the garden, working alone.

Answer: E

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion