BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

GMAC Work Problem

Expert replies
by DCJ » Wed Oct 14, 2009 5:43 pm
Machine A produces pencils at a constant rate of 9000 pencils per hour and machine B produces pencils at a constant rate of 7000 pencils per hour. If the two machines together must produce 100000 pencils and if each machine can operate for at most 8 hours. What is the least amount of time in hours that machine B must operate?

4
4 2/3
5 1/3
6
6 1/4

Ans: 4
Join the discussion
Source: — Problem Solving |

Re: GMAC Work Problem

by mpaudena » Wed Oct 14, 2009 8:57 pm
DCJ wrote:Machine A produces pencils at a constant rate of 9000 pencils per hour and machine B produces pencils at a constant rate of 7000 pencils per hour. If the two machines together must produce 100000 pencils and if each machine can operate for at most 8 hours. What is the least amount of time in hours that machine B must operate?

4
4 2/3
5 1/3
6
6 1/4

Ans: 4
Work problems can be difficult because of the way that you have to place the figures involved. Different people do it differently. I typically put the rate of work as follows: the amount of work done as the numerator and the amount of time that that amount of work is done in as the denominator. In this case the amount of time is 1 hour in both cases so there is no need for a numerator, e.g., 9,000/1 = 9,000 and 7,000/1.

Now that is just the rate at which the work is done. The numerator is just the amount of time that the machine would take to create the amount of pencils. The numerator is not the actual amount of time that the machine will actually be in operation. The amount of time the machines will be in operation, if not given to you, is an unknown and must therefore be represented as a variable. So if we pick x as the variable representing the amount of time that machine B will be in operation at the given rate of 7,000 pencils per hour, it would be like this: (7,000/1)x.

However, in this case you are told the amount of time that the machines are permitted to work for - 8 hours. So if you want to know how much time B will have to work if A can only work for 8 hours then you've got:

(9,000/1)8 + (7,000/1)x = 100,000.

After that it's simply doing the math:

9,000*8 = 72,000;
100,000 - 72,000 = 28,000;
28,000/7,000 = 4.
So x = 4 and x is the number of hours machine B would have to operate to meet it's contribution to the total number of pencils produced (100,000).
Join the discussion

by sanjana » Wed Oct 14, 2009 9:30 pm
Always remember :
When u have to Maximize one quantity,minimize everything else.
When u have to minimize one quantity,maximize everything else.

Here we want to minimize the hours worked by B so maximize the hourse worked by A.
The max can be 8 Hrs as the question states.
Join the discussion

by antondesh » Thu Oct 15, 2009 12:20 pm
We basically have to use up all of machine A before we start using machine B.

The most we can use it for is 8 hours, so using machine A we can produce 9,000 x 8 hours = 72,000 pencils. After we produced 72,000 pencils, we now have to move up to machine B.

We still have 100,000 - 72,000 = 28,000 pencils left to produce. Machine B produces them at a rate of 7,000 per hour so it'll take 28,000 divided by 7,000 = 4 hours.
Join the discussion

by Scott@TargetTestPrep » Fri Dec 15, 2017 5:57 am
DCJ wrote:Machine A produces pencils at a constant rate of 9000 pencils per hour and machine B produces pencils at a constant rate of 7000 pencils per hour. If the two machines together must produce 100000 pencils and if each machine can operate for at most 8 hours. What is the least amount of time in hours that machine B must operate?

4
4 2/3
5 1/3
6
6 1/4
If machine B's operational time is to be minimized, we must maximize the time for machine A to operate. Since each machine can operate for at most 8 hours, we can let machine A operate for 8 hours. Since the rate of machine A is 9000 pencils per hour, machine A produces 8 x 9000 = 72,000 pencils, and thus 28,000 pencils are left to be produced.

Thus, it will take machine B 28,000/7,000 = 4 hours to produce the remaining pencils.

Answer: A

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion