LUANDATO wrote:Of the 2,500 tons of ore mined daily at a quarry, 0.4 percent results in a certain pure metal. In how many days of mining will the total amount of pure metal produced at the quarry be equal to the daily amount of ore mined?
A 10
B 100
C 250
D 400
E 1,000
Every day 0.4% of the desired amount of metal is produced.
(100%)/(0.4%) = 100/0.4 = 1000/4 = 250.
Put another way:
(250)(0.4%) = 100%,
Implication:
Working at a rate of 0.4% per day, the quarry will require 250 days to produce 100% of the desired amount of metal.
The correct answer is
C.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.
As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.
For more information, please email me (Mitch Hunt) at
[email protected].
Student Review #1
Student Review #2
Student Review #3