BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Machine A and B

Expert replies
by BTGmoderatorDC » Wed Sep 13, 2017 3:41 am
Machine A can do a job in 24 hours at a constant rate. If Machine A does the job for 8 hours and Machine B does the rest of the job, which works at 2/3 constant rate of Machine A. How long will it take for Machine B alone to do the rest of the job?

A. 12hrs
B. 16hrs
C. 24hrs
D. 28hrs
E. 32hrs

Is there a strategic approach to this? Experts help please. Thanks

OA C
Join the discussion
Source: — Problem Solving |

by GMATGuruNY » Wed Sep 13, 2017 4:01 am
lheiannie07 wrote:Machine A can do a job in 24 hours at a constant rate. If Machine A does the job for 8 hours and Machine B does the rest of the job, which works at 2/3 constant rate of Machine A. How long will it take for Machine B alone to do the rest of the job?

A. 12hrs
B. 16hrs
C. 24hrs
D. 28hrs
E. 32hrs
Let the job = 72 widgets.

Since A takes 24 hours to complete the job, A's rate = w/t = 72/24 = 3 widgets per hour.
At a rate of 3 widgets per hour, the work produced by A in 8 hours = rt = 3*8 = 24 widgets.

Remaining work = 72-24 = 48 widgets.
Since B's rate is 2/3 of A's rate, B's rate = (2/3)(3) = 2 widgets per hour.
At a rate of 2 widgets per hour, the time for B to produce the remaining 48 widgets = w/r = 48/2 = 24 hours.

The correct answer is C.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by DavidG@VeritasPrep » Wed Sep 13, 2017 6:07 am
lheiannie07 wrote:Machine A can do a job in 24 hours at a constant rate. If Machine A does the job for 8 hours and Machine B does the rest of the job, which works at 2/3 constant rate of Machine A. How long will it take for Machine B alone to do the rest of the job?

A. 12hrs
B. 16hrs
C. 24hrs
D. 28hrs
E. 32hrs

Is there a strategic approach to this? Experts help please. Thanks

OA C
If machine A can complete the job in 24 hours, and it works for 8 hours, then it has completed 8/24 or 1/3 of the job, leaving 2/3 of the job for B to complete.

If Machine A's rate was 1 job/24 hours, or 1/24, and B's rate is 2/3 of this, then B's rate is (2/3) * (1/24) = 1/36.

If Machine B works for T hours at a rate of 1/36 and must complete 2/3 of a job, we get the following equation: (1/36) * T = 2/3 --> T = 24; The answer is C
Veritas Prep | GMAT Instructor

Veritas Prep Reviews
Save $100 off any live Veritas Prep GMAT Course
Join the discussion

by DavidG@VeritasPrep » Wed Sep 13, 2017 6:10 am
lheiannie07 wrote:Machine A can do a job in 24 hours at a constant rate. If Machine A does the job for 8 hours and Machine B does the rest of the job, which works at 2/3 constant rate of Machine A. How long will it take for Machine B alone to do the rest of the job?

A. 12hrs
B. 16hrs
C. 24hrs
D. 28hrs
E. 32hrs

Is there a strategic approach to this? Experts help please. Thanks

OA C
Another approach. If Machine A has worked for 8 hours, and it takes Machine A 24 hours to complete the job, it would take Machine A an additional 16 hours to finish the job alone.

Rate and Time have a reciprocal relationship. If B's rate is 2/3 of A's rate, then it would take B 3/2 of A's Time to complete the job. If it would have taken A 16 hours to complete the job, it would take B 16*(3/2) or 24 hours. The answer is C.
Veritas Prep | GMAT Instructor

Veritas Prep Reviews
Save $100 off any live Veritas Prep GMAT Course
Join the discussion

by Scott@TargetTestPrep » Wed Sep 20, 2017 2:39 pm
lheiannie07 wrote:Machine A can do a job in 24 hours at a constant rate. If Machine A does the job for 8 hours and Machine B does the rest of the job, which works at 2/3 constant rate of Machine A. How long will it take for Machine B alone to do the rest of the job?

A. 12hrs
B. 16hrs
C. 24hrs
D. 28hrs
E. 32hrs
The rate of Machine A is 1/24, so in 8 hours, 1/3 of the job is completed, and thus 2/3 of the job is left to be completed.

If the rate of Machine B is 2/3 that of Machine A, then the rate of Machine B is (2/3)(1/24) = 1/36.

Thus, it will take Machine B (2/3)/(1/36) = 2/3 x 36 = 24 hours to complete the rest of the job.

Answer: C

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion

by BTGmoderatorDC » Fri Sep 22, 2017 1:07 pm
Thank you so much for the solution, but is there an easier way to solve this?
Join the discussion