BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

One last help with proportions please

Expert replies
by fambrini » Tue Oct 11, 2016 6:02 pm
Running at their respective constant rates, machine X takes 2 days longer to produce w widgets than machine Y. At these rates, if the two machines together produce 5w/4 widgets in 3 days, how many days would it take machine X alone to produce 2w widgets?

A) 4
B) 6
C) 8
D) 10
E) 12

OA: E
Join the discussion
Source: — Problem Solving |

by GMATGuruNY » Wed Oct 12, 2016 2:45 am
fambrini wrote:Running at their respective constant rates, machine X takes 2 days longer to produce w widgets than machine Y. At these rates, if the two machines together produce 5w/4 widgets in 3 days, how many days would it take machine X alone to produce 2w widgets?

A) 4
B) 6
C) 8
D) 10
E) 12
Let w = 60 widgets, implying that (5/4)w = (5/4)(60) = 75 widgets.
Since X and Y together can produce (5/4)w widgets in 3 days, the combined rate for X and Y = w/t = 75/3 = 25 widgets per day.

We can PLUG IN THE ANSWERS, which represent X's time to produce 2w widgets.
When the correct answer choice is plugged in, the combined rate for X and Y will be 25 widgets per day.

D: 10
Here, X can produce 2w widgets in 10 days.
Thus, the time for X to produce w widgets = 5 days.

Since X takes 5 days to produce w=60 widgets, X's rate = w/t = 60/5 = 12 widgets per day.
Since X takes 2 days longer than Y to produce w widgets, Y's time to produce w widgets = 3 days.
Since Y takes 3 days to produce w=60 widgets, Y's rate = w/t = 60/3 = 20 widgets per day.
Combined rate for X and Y = 12+20 = 32 widgets per day.

Here, X and Y are working TOO FAST.
Implication:
X must take LONGER to produce 2w widgets, with the result that X and Y will work more SLOWLY.

The correct answer is E.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by Mo2men » Wed Oct 12, 2016 6:56 am
fambrini wrote:Running at their respective constant rates, machine X takes 2 days longer to produce w widgets than machine Y. At these rates, if the two machines together produce 5w/4 widgets in 3 days, how many days would it take machine X alone to produce 2w widgets?

A) 4
B) 6
C) 8
D) 10
E) 12

OA: E
Another alternative solution:

Let machine Y takes z days to complete W widgets.

Then machine X takes z+2 days to complete W widgets.

Combined work for both produce 5w/4 in 3 days

Translating the above into rate-time-work equation

[w/z + w/(z+2)]* 3 = 5w/4

1/z + 1/(z+2) = 5/12

We need to find z that create 12 in denominator

z = 4

If it takes 6 days to produce w, then it will take 12 days to produce 2w.

Answer: E
Join the discussion

by schelljo » Sun Jan 08, 2017 4:58 pm
Good Evening-

I am looking for expert help as I am not sure what I am doing wrong. I tried two ways, Algebra & Smart #, and still can't solve the problem. The main difference I see between the setup between the answers in the forum and mine is that I labeled the T (see chart) as D+2 for X and D for Y VS D for X an D-2 for Y. I realize that the second would have been wiser as the answer is asking for X, but i believe both would be valid. Can someone help me understand my error? Thanks much!
Attachments
OG Extra Quant PS 174.pdf
(186.67 KiB) Downloaded 139 times
Join the discussion

by DavidG@VeritasPrep » Tue Jan 10, 2017 4:06 am
schelljo wrote:Good Evening-

I am looking for expert help as I am not sure what I am doing wrong. I tried two ways, Algebra & Smart #, and still can't solve the problem. The main difference I see between the setup between the answers in the forum and mine is that I labeled the T (see chart) as D+2 for X and D for Y VS D for X an D-2 for Y. I realize that the second would have been wiser as the answer is asking for X, but i believe both would be valid. Can someone help me understand my error? Thanks much!
You did nothing wrong! Here's where you abandoned ship: 5d^2 -14d - 24 = 0.

All that's left to do is factor: (5d + 6)(d - 4) = 0; d = -6/5 or d = 4. (Obviously d can't be negative, so d = 4.)

If d = 4, d + 2 = 6. If Machine X can do w widgets in 6 days, it can do 2w widgets in 12 days. You were two steps away.

Takeaway: trust yourself!
Veritas Prep | GMAT Instructor

Veritas Prep Reviews
Save $100 off any live Veritas Prep GMAT Course
Join the discussion

by rsarashi » Tue Jan 10, 2017 10:02 am
Hi Experts,

Can you please explain by 1/k approach?

Thanks,

Rashi
Join the discussion

by DavidG@VeritasPrep » Tue Jan 10, 2017 10:10 am
rsarashi wrote:Hi Experts,

Can you please explain by 1/k approach?

Thanks,

Rashi
I'm not quite sure what you're asking here, Rashi. Do you mean you'd like to see the setup in the event that k represents that number of days it takes X to complete 1 job, and so X's rate would be 1 job/ k days, or 1/k ?
Veritas Prep | GMAT Instructor

Veritas Prep Reviews
Save $100 off any live Veritas Prep GMAT Course
Join the discussion

by rsarashi » Wed Jan 11, 2017 9:00 am
I'm not quite sure what you're asking here, Rashi. Do you mean you'd like to see the setup in the event that k represents that number of days it takes X to complete 1 job, and so X's rate would be 1 job/ k days, or 1/k ?
Hi David,

Thanks for your reply.

Sorry for the confusion. I mean if A did a job in x days, then in A day it will be 1/x days. This approach i was talking about.

Please explain me in this approach.

Thanks,

Rashi
Join the discussion

by Danny@GMATAcademy » Wed Jan 11, 2017 9:47 am
We can use the "add up the rates to get the combined rate" method to build an equation. (rsarashi, I think this is what you are referring to -- in your example, 1/k is a rate; something can do 1 job in k hours, or 1/k jobs per hour)

X's Rate + Y's rate = Combined rate

Since Rate = (Work) / (Time), we get


X's Rate + Y's rate = Combined rate --->
w/(x) + w/(y) = (5w/4)/3 [x represents X's time to make w widgets, y represents Y's]
w/(x) + w/(x-2) = (5w/4)/3 [If X takes two more days, then Y takes two fewer]
1/(x) + 1/(x-2) = 5/12

Algebra looks unpleasant (though it would certainly be possible), so let's switch to working with the answer choices. Somehow we want a 12 in the denominator, so I'll start with an answer choice that seems likely to lead to that.

Let's pretend B is the answer. The question is asking how long it would take x to make 2w widgets. If X takes 6 days to make 2w, it would take 3 days to make w (that's what our x represents in our equation above, so lets plug in:

1/(3) + 1/(3-2) = 5/12 --> No good. the left is much bigger than the right. To make the left smaller, let's pick a number that will lead to bigger denominators on the left.

Let's pretend E is the answer (it will lead to smaller values on the left and seems likely to lead to a 12 in the denominator). The question is asking how long it would take X to make 2w widgets. If X takes 12 days to make 2w, it would take 6 days to make w (that's what our x represents in our equation above, so let's plug in:

1/(6) + 1/(6-2) = 5/12

1/6 + 1/4 = 5/12

2/12 + 3/12 = 5/12 --> Good. E is our answer.


More on the method used above here: https://www.youtube.com/watch?v=GAOel-n ... TbTHvt40S0