BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Work and Time Math (Emergency Please)

Expert replies
Source: — Problem Solving |

by GMATGuruNY » Fri Jul 11, 2014 5:45 am
jahid43 wrote:2 men and 3 boys can do a piece of work in 10 days which 3 men and 2 boys can do the same work in 8 days. In how many days can 2 men 1 boy do the work?
This is not reflective of an actual GMAT problem.
That said, we can glean some take-aways from the solution, so here goes:

Let the job = 800 units.

Since 2 men and 3 boys take 10 days to produce 800 units, the rate for 2M + 3B = w/t = 800/10 = 80 units per day.
Thus:
2M + 3B = 80 units per day.

Since 3 men and 2 boys take 8 days to produce 800 units, the rate for 3M + 2B = w/t = 800/8 = 100 units per day.
Thus:
3M + 2B = 100 units per day.

Adding the two equations, we get:
(2M + 3B) + (3M + 2B) = 80 + 100
5M + 5B = 180
M + B = 36 units per day.

Subtracting the first equation from the second, we get:
(3M + 2B - (2M + 3B) = 100 - 80
M - B = 20 units per day.

Adding together M+B=36 and M-B=20, we get:
(M+B) + (M-B) = 36 + 20
2M = 56 units per day.
M = 28 units per day.

Since M=28 and M-B = 20, B = 8 units per day.

Thus:
Rate for 2M + B = 2*28 + 8 = 64 units per day.
Time for 2M + B to produce 800 units = w/r = 800/64 = 100/8 = 12.5 days.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by GMATinsight » Fri Jul 11, 2014 8:45 am
2 men and 3 boy can do a piece of work in 10 days which 3 men and 2 boys can do the same work in 8 days. In how many days can 2 men 1 boy do the work?
(2M + 3B)'s 10 day work = 1

(3M + 2B)'s 8 day work = 1

Therefore,
(2M + 3B) x 10 = (3M + 2B) x 8
20M + 30B = 24M + 16B

4M = 14B
1M = 3.5B

Now,
(Manpower x Time)/ Work = Constant

Therefore, {if a is the number of days taken by 2M and 1B to finish the work}
[(2M + 3B) x 10]/1 = [(2M + 1B) x a]/1
[(7B + 3B) x 10]/1 = [(7B + 1B) x a]/1 {Because 2M = 7B}
[(7B + 3B) x 10]/1 = [(7B + 1B) x a]/1
10B x 10 = 8B x a
a = 100/8 = 12.5 Days
"GMATinsight"Bhoopendra Singh & Sushma Jha
Most Comprehensive and Affordable Video Course 2000+ CONCEPT Videos and Video Solutions
Whatsapp/Mobile: +91-9999687183 l [email protected]
Contact for One-on-One FREE ONLINE DEMO Class Call/e-mail
Most Efficient and affordable One-On-One Private tutoring fee - US$40-50 per hour
Join the discussion

by theCodeToGMAT » Sat Jul 12, 2014 1:05 am
W = R * T
1 = (2M + 3B) * 10 - (1)
1 = (3M + 2B) * 8

To find: (1)/(R)

20M + 30B = 24M + 16B
4M = 14B
M = 3.5B
Using in (1)
B = 1/100

So,
1/ (2M + 1B)
1/(8B)
1/8 * 100
12.5
R A H U L