BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATBootcamp Starts Sep 21
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE BOOTCAMP

Live Online Bootcamp Class with Top GMAT Expert Chris Peckover

Sep 21 to Oct 9, 2026

Schedule
Mon to Fri · 7:00 to 10:00 PM ET
Included
Live classes + 6 months of TTP OnDemand
  • Boost your GMAT score in less than one month in a live online class
  • 6 months access to TTP OnDemand video courses included
View bootcamp & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

729

Expert replies
by vaivish » Fri Aug 08, 2008 6:09 am
729. The development of a new jumbo rocket that is expected to carry the United States into its next phase of space exploration will be able to deliver a heavier load of instruments into orbit than the space shuttle and at a lower cost.
(A) The development of a new jumbo rocket that is expected to carry the United States into its next phase of space exploration will be able to deliver a heavier load of instruments into orbit than the space shuttle and at a lower cost.
(B) The development of a new jumbo rocket is expected to carry the United States into its next phase of space exploration and be able to deliver a heavier load of instruments into orbit at a lower cost than the space shuttle.
(C) The new development of a jumbo rocket, which is expected to carry the United States into its next phase of space exploration, will be able to deliver a heavier load of instruments into orbit at a lower cost than the space shuttle.
(D) A newly developed jumbo rocket, which is expected to carry the United States into its next phase of space exploration, will be able to deliver a heavier load of instruments into orbit than the space shuttle can, and at a lower cost.
(E) A newly developed jumbo rocket, which is expected to carry the United States into its next phase of space exploration, will be able to deliver a heavier load of instruments into orbit than the space shuttle and to cost less.

Oa is D.
Join the discussion
Source: — Sentence Correction |

by reachac » Fri Aug 08, 2008 6:18 am
The thing to think about here is that it is the rocket and not the process of development of the rocket which will do the things mentioned in the sentence.

Hence A,B and C are eliminated.

In E 'can' is missing after space shuttle. Also "to cost less" is incorrect in the context
Join the discussion

by kiranlegend » Sat Aug 09, 2008 12:29 am
agree D is the best option for me too.. however doesn't D look awkward????

a comma before and at the end??

...can, and at a lower cost.


guys, expert opinions pls?
Join the discussion

by eccentric » Sat Aug 09, 2008 11:58 pm
The construction of sentence in C is most appropriate, However the initial ;part of sentence changes the meaning hence C is rled out...
The next best option is D & E..
Join the discussion

• Page 1 of 1