BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Rate Questions Strategy

Expert replies
by mdecarbo » Sat Apr 06, 2013 12:09 pm
I recently took a quant section of a GMAT CAT exam. I came across a few rate questions and wanted to understand the best strategies in tackling them. In general, I have a bit of problem setting these up when it's not straight someone does it at this rate, the other at this rate, what is rate together.. I am going to try to summarize the questions, but I think the idea will get across.

1. Peter does a job alone and it takes 1/x of an hour to complete it. When Adam joins together they get the same job done in an hour. How much of the work does Adam get done in 20 minutes?

2. Machine A does a job in a certain time, Machine B does the same job in a certain time. When doing the job together, how much of the work does Machine B NOT have to complete?

Thanks for any input / advice.
Join the discussion
Source: — Problem Solving |

by srcc25anu » Sat Apr 06, 2013 1:11 pm
The situation that you have considered in not Logical. Peter completes a job in 1/x hrs. and Peter + Adam complete it in 1 hour. This is not logical since when Adam joins in, the work should get completed sooner than later and 1/x < 1. If x = 2, we are saying Peter alone can complete a job in 1/2 hour but when Adam also joins him, they complete in 1 hour.

usually the problem is of the form that it takes X hours for A to complete the job. and A+B can complete it in Y hours where Y < X.

So lets say Peter can complete a job in 6 hours and when Peter and Adam work together, they can finish the job in 4 hours. what is Adam's rate of work (OR how much work can Adam alone complete in 20 mins = 1/3rd of an hour)

Let us assume total work = some mult. of 6 and 4
let say TOTAL WORK = 12
In 1 hour:
Peter can do 12/6 = 2 units of work
Peter + Adam can do 12/4 = 3 units of work
Therefore Adam must be doing 1 unit in 1 hour

Now if Adam does 1 unit in 1 hour, he must be doing 1/3 units in 1/3 hour.
Join the discussion

by srcc25anu » Sat Apr 06, 2013 1:26 pm
Q2. Machine A does a job in a certain time, Machine B does the same job in a certain time. When doing the job together, how much of the work does Machine B NOT have to complete?

Let Mach A complete a job in 3 hours
Let Mach B complete a job in 5 hours
if they work together, the rate of work that Mach A does to rate of work that Mach B does will be in the ratio of their respective speeds

So we need to know the speed of work for both Mach A and Mach B.
Lets consider some multiple of 3 and 5 as total work to be done.
Let W (total Work) = 15
In 1 hour:
Mach A does 15/3 = 5 units/hr
mach B does 15/5 = 3 units/hr
What % of work Mach B NOT have to complete or simultaneously what % of work does Mach A HAVE to complete.
That will be 5*100/8 % or 62.5%

Another approach:
Ratio of Time in INVERSELY PROPORTIONAL to ratio of speeds
if TIME of MAch A: TIME of MAch B = 3:5
Thus Speed of MAch A: Speed of MAch B = 5:3
How much work B HAVE to complete: 3/8
How much work B NOT HAVE to complete? 1-3/8 = 5/8 (which is equal to Mach A speed of work)
as speed and work done are directly proportional. Faster the speed, more work completed.
Join the discussion

by mdecarbo » Sat Apr 06, 2013 1:30 pm
Sorry,

I think that I asked the question wrong.

Peter can do 1/x of the job in an hour[/b]... that might make the question logical.[/b]
Join the discussion