BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Rate Problem

Expert replies
by phoenix9801 » Thu May 31, 2012 4:27 pm
Xavier and Yvette can complete a job in 1.2 hrs, and Xavier and Zed can complete that job in 1.5hrs. If Yvette and Zed can complete the same job in 2 hours, how many hours will it take all three people to complete that job if they work simultaneously at their respective constant rates and without a break?

A) 1
B) 2
C) 2:35
D) 3
E) It cannot be determined from the information given.




In 9 days, a certain job can be completed by eight machines working simultaneously and at the same constant rate. How many fewer machines, each working at the same constant rate, would be needed to complete the job in 12 days?

A) 2
B) 3
C) 4
D) 6
E) 8
Join the discussion
Source: — Problem Solving |

by GMATGuruNY » Thu May 31, 2012 4:46 pm
phoenix9801 wrote:Xavier and Yvette can complete a job in 1.2 hrs, and Xavier and Zed can complete that job in 1.5hrs. If Yvette and Zed can complete the same job in 2 hours, how many hours will it take all three people to complete that job if they work simultaneously at their respective constant rates and without a break?

A) 1
B) 2
C) 2:35
D) 3
E) It cannot be determined from the information given.
Let the job = 6 units.

Rate for X+Y = w/t = 6/(1.2) = 60/12 = 5 units per hour.
Rate for X+Z = w/t = 6/(1.5) = 60/15 = 4 units per hour.
Rate for Y+Z = w/t = 6/2 = 3 units per hour.

When elements work together, ADD THEIR RATES.
(X+Y) + (X+Z) + (Y+Z) = 5+4+3
2X + 2Y + 2Z = 12
X+Y+Z = 6 units per hour.

Thus, the time for X+Y+Z to complete the job = w/r = 6/6 = 1 hour.

The correct answer is A.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by GMATGuruNY » Thu May 31, 2012 5:29 pm
phoenix9801 wrote: In 9 days, a certain job can be completed by eight machines working simultaneously and at the same constant rate. How many fewer machines, each working at the same constant rate, would be needed to complete the job in 12 days?

A) 2
B) 3
C) 4
D) 6
E) 8
Approach 1:

Plug in a RATE FOR EACH MACHINE.

Let the rate for each machine = 1 unit per day.
Rate for 8 machines = 8 units per day.
Over 9 days, the number of units produced by 8 machines = r*t = 8*9 = 72 units.

For 72 units to be produced in 12 days, the number of units that must produced each day = 72/12 = 6 units per day.
Since 2 fewer units must be produced each day -- 6 units per day, down from 8 units per day -- 2 fewer machines are needed.

The correct answer is A.

Approach 2:

{number of machines)(number of days) = (number of machines)(number of days)

Thus:
(8 machines)(9 days) = (x machines)(12 days)
8 * 9 = x * 12
72 = 12x
x = 6.

Thus, for the job to be completed in 12 days, only 6 machines are needed -- 2 fewer machines.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by coolhabhi » Fri Jun 01, 2012 9:38 pm
GMATGuruNY wrote:
phoenix9801 wrote: In 9 days, a certain job can be completed by eight machines working simultaneously and at the same constant rate. How many fewer machines, each working at the same constant rate, would be needed to complete the job in 12 days?

A) 2
B) 3
C) 4
D) 6
E) 8
Approach 1:

Plug in a RATE FOR EACH MACHINE.

Let the rate for each machine = 1 unit per day.
Rate for 8 machines = 8 units per day.
Over 9 days, the number of units produced by 8 machines = r*t = 8*9 = 72 units.

For 72 units to be produced in 12 days, the number of units that must produced each day = 72/12 = 6 units per day.
Since 2 fewer units must be produced each day -- 6 units per day, down from 8 units per day -- 2 fewer machines are needed.

The correct answer is A.

Approach 2:

{number of machines)(number of days) = (number of machines)(number of days)

Thus:
(8 machines)(9 days) = (x machines)(12 days)
8 * 9 = x * 12
72 = 12x
x = 6.

Thus, for the job to be completed in 12 days, only 6 machines are needed -- 2 fewer machines.
Mitch shouldn't the answer for "How many fewer machines" should be 6 because the question is indirectly hinting that the machines are less than 8 and so the number of machines required for 12 days.

I mean should the answer be the difference in the number of machines or should it be the number required for 12 days? Please help..
Join the discussion