GMAC practice test - stumped

This topic has expert replies
Junior | Next Rank: 30 Posts
Posts: 24
Joined: Tue May 29, 2012 3:30 pm

GMAC practice test - stumped

by Striver » Wed May 30, 2012 4:21 pm
GMAC PRACTICE TEST

Shipment Number Defective Total Chips
S1 2 5000
S2 5 12,000
S3 6 18,000
S4 4 16,000

A computer chip manufacturer expects the ratio of the number of defective chips to the total number of chips in all future shipments to equal the corresponding ratio for shipments in S1, S2, S3, and S4 combined, as shown in the table above. What is the expected number of defective chips in a shipment of 60,000 chips?

A) 14
B) 20
C) 22
D) 24
E) 25
Source: — Problem Solving |

GMAT/MBA Expert

User avatar
GMAT Instructor
Posts: 3835
Joined: Fri Apr 02, 2010 10:00 pm
Location: Milpitas, CA
Thanked: 1854 times
Followed by:523 members
GMAT Score:770

by Anurag@Gurome » Wed May 30, 2012 7:14 pm
Striver wrote:GMAC PRACTICE TEST

Shipment Number Defective Total Chips
S1 2 5000
S2 5 12,000
S3 6 18,000
S4 4 16,000

A computer chip manufacturer expects the ratio of the number of defective chips to the total number of chips in all future shipments to equal the corresponding ratio for shipments in S1, S2, S3, and S4 combined, as shown in the table above. What is the expected number of defective chips in a shipment of 60,000 chips?

A) 14
B) 20
C) 22
D) 24
E) 25
Total no. of shipments = 5000 + 12000 + 18000 + 16000 = 51000
Total no. of defective chips = 2 + 5 + 6 + 4 = 17
Let x be the expected number of defective chips in a shipment of 60000 chips.
Then 17:51000 = x:60000
x = 20

The correct answer is B.
Anurag Mairal, Ph.D., MBA
GMAT Expert, Admissions and Career Guidance
Gurome, Inc.
1-800-566-4043 (USA)

Join Our Facebook Groups
GMAT with Gurome
https://www.facebook.com/groups/272466352793633/
Admissions with Gurome
https://www.facebook.com/groups/461459690536574/
Career Advising with Gurome
https://www.facebook.com/groups/360435787349781/