BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

GMAT Prep #1 - Machines type R and Type S

Expert replies
by veenitj » Tue May 08, 2012 7:52 am
A compnay has two types of M/c, type R and type S. Operating at a constant rate, am/c of type R does a certain job in 36 hr and m/c type S does the sam job in 18 hr. If the copmany used the same # of each type to do this job in 2 hr, how many m/c of type R wer used?

3
4
6
9
12

We can easly cross out option a,b,d. I did it correct but some how I am not able to solve the problem.

Will appreciate any replies.

Thanks
VJ

OA=c
Join the discussion
Source: — Problem Solving |

by Bill@VeritasPrep » Tue May 08, 2012 8:09 am
Each type R has a rate of 1/36, and each type S has a rate of 1/18 (or 2/36). This means that each type S machine does twice as much work as each type R machine.

In order to complete the job in 2 hours, the combined rate of all machines must be 1/2 (or 18/36). Since each type S machine does twice as much work as each type R machine, then the total amount of work done by type S machines must be twice as much as the total amount of work done by type R machines.

Of the combined rate of 18/36, 12/36 must be type S and 6/36 must be type R.

Type S: 12/36 divided by the individual rate of 2/36 means that 6 type S machines were used.

Type R: 6/36 divided by the individual rate of 1/36 means that 6 type R machines were used.

Since the question asks about type R, the correct answer is C.
Join Veritas Prep's 2010 Instructor of the Year, Matt Douglas for GMATT Mondays

Visit the Veritas Prep Blog

Try the FREE Veritas Prep Practice Test
Join the discussion

by niketdoshi123 » Tue May 08, 2012 9:21 am

A compnay has two types of M/c, type R and type S. Operating at a constant rate, am/c of type R does a certain job in 36 hr and m/c type S does the sam job in 18 hr. If the copmany used the same # of each type to do this job in 2 hr, how many m/c of type R wer used?

3
4
6
9
12
# of machines used of each type = n
Rate of R = 1/36
Combined rate of all R machines= n/36
Rate of S = 1/18
Combined rate of all S machines= n/18

Combined Rate of all machines= 1/2
(n/36)+(n/18)=1/2
3*n/36=1/2
n=6
hence answer is C[/quote]
Join the discussion

by GMATGuruNY » Tue May 08, 2012 9:26 am
To avoid fractions, plug in a value for the job. I posted a solution here:

https://www.beatthegmat.com/gmat-prep-1- ... 08621.html
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by mdavidm_531 » Tue May 08, 2012 6:40 pm
Hi, Experts,

I see that this assumption is very important to the problem: "If the copmany used the same # of each type to do this job"

I wonder what will happen if such assumption is not stated. Would we need to have two equations?

Thanks
Join the discussion