BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Machines OG

Expert replies
by Thouraya » Sun Sep 18, 2011 12:10 am
Machine A produces bolts at a uniform rate of 120 every 40 seconds, and Machine B produces bolts at a uniform rate of 100 every 20 seconds. If the two machines run simultaneously, how many seconds will it take for them to produce a total of 200 bolts?

Answer: By calculation, we find out that Machine A produces 3 bolts/sec, and Machine B produces 5 bolt/sec.

To find out how much they produce simultaneously, GMAT assumed that based on above, they make 8 bolts/sec, hence can find out how many sec it will take them to produce 200.

My question is, why did we not use the formula: 1/3 + 1/5 =1/T to find how much total they produce in 1 sec?

Any help appreciated!
Join the discussion
Source: — Problem Solving |

by cans » Sun Sep 18, 2011 2:12 am
1/3 + 1/5 = 1/T is used when we know that 1 bolt can be made in 3 sec by A and in 5 sec by B and thus in T sec (combined)
A 1 bolt: 1/3 sec
B 1 bolt: 1/5 sec
Thus time taken combined for 1 bolt = T
1/T = 1/(1/3) + 1/ (1/5) = 8
This T = 1/8. 1 bolt can be made in 1/8 sec or in 1 sec we can make 8 bolts...
If my post helped you- let me know by pushing the thanks button ;)

Contact me about long distance tutoring!
[email protected]

Cans!!
Join the discussion

by Proleefeek » Sun Sep 18, 2011 2:21 am
cans wrote:1/3 + 1/5 = 1/T is used when we know that 1 bolt can be made in 3 sec by A and in 5 sec by B and thus in T sec (combined)
A 1 bolt: 1/3 sec
B 1 bolt: 1/5 sec
Thus time taken combined for 1 bolt = T
1/T = 1/(1/3) + 1/ (1/5) = 8
This T = 1/8. 1 bolt can be made in 1/8 sec or in 1 sec we can make 8 bolts...
A simpler way to look at it maybe that in this case you already know the rate of work done per unit time which is 3 and 5 resp for the 2 machines. In cases, where we cannot quantify the work in terms of units directly, for example a building or a dam etc, we can use the fraction method as rightly pointed out by you.
Join the discussion

by Abhishek009 » Sun Sep 18, 2011 5:03 am
Thouraya wrote:Machine A produces bolts at a uniform rate of 120 every 40 seconds, and Machine B produces bolts at a uniform rate of 100 every 20 seconds. If the two machines run simultaneously, how many seconds will it take for them to produce a total of 200 bolts?

Answer: By calculation, we find out that Machine A produces 3 bolts/sec, and Machine B produces 5 bolt/sec.

To find out how much they produce simultaneously, GMAT assumed that based on above, they make 8 bolts/sec, hence can find out how many sec it will take them to produce 200.

My question is, why did we not use the formula: 1/3 + 1/5 =1/T to find how much total they produce in 1 sec?

Any help appreciated!

Machine A produces bolts at a uniform rate of 120 every 40 seconds , so it produces 3 bolts/sec

Machine B produces bolts at a uniform rate of 100 every 20 seconds , so it produces 5 bolts/sec


Together they produces 8 bolts/sec




Now to produce 200 bolts time required is 200/8 => 25 seconds...[/b]
Abhishek
Join the discussion

by mehrasa » Sun Sep 18, 2011 5:19 am
how u calculated both together can produce 8 bolts per second??????

machine A: 120/40= 3 bolts/sec
machine B) 100/20=5 bolts/sec
together in one second : 1/3+1/5= 8/15 ==> each second 15/8 bolt can be produced
now 200 bolts in ?? seconds
200*8/15= 320/3

where i did wrong here?????????
Join the discussion

by Abhishek009 » Sun Sep 18, 2011 5:29 am
mehrasa wrote:how u calculated both together can produce 8 bolts per second??????

machine A: 120/40= 3 bolts/sec
machine B) 100/20=5 bolts/sec
together in one second : 1/3+1/5= 8/15 ==> each second 15/8 bolt can be produced
now 200 bolts in ?? seconds
200*8/15= 320/3

where i did wrong here?????????

Bro I am using the simple concept of addition of efficiency of Machine A and B...

I am deliberately not using fractions beacuse it is time consuming.


If A can produce 3 units/ sec and B can produce 5 units / sec , then total they produce 5 + 3 = 8 units/second.

This 8 units is the combined production of Machine A and Machine B working Individually and Individually , in a second....


Consider U hav 2 machines in your factory and U run them for a second each:


A producing 3 units

B producing 5 units
____________________

Total 8 units


So Working Independently they produce 8 units / second...





Now consider this as a problem of Time , Speed and Distance...


Here Ur distance is 200 units and Speed is 8 units / sec


So , Tie taken for Production of 200units is 200/8 { Using simple concept , Time = distance/Speed}

Thus total time taken is 25 seconds...


Hope this clears your doubts..
Abhishek
Join the discussion

by sl750 » Sun Sep 18, 2011 11:38 am
Thouraya wrote:Machine A produces bolts at a uniform rate of 120 every 40 seconds, and Machine B produces bolts at a uniform rate of 100 every 20 seconds. If the two machines run simultaneously, how many seconds will it take for them to produce a total of 200 bolts?

Answer: By calculation, we find out that Machine A produces 3 bolts/sec, and Machine B produces 5 bolt/sec.

To find out how much they produce simultaneously, GMAT assumed that based on above, they make 8 bolts/sec, hence can find out how many sec it will take them to produce 200.

My question is, why did we not use the formula: 1/3 + 1/5 =1/T to find how much total they produce in 1 sec?

Any help appreciated!
We don't have to because we are already given the respective rates
A's rate 120 bolts every 40 sec or 3 bolts/sec
B's rate 100 bolts every 20 sec or 5 bolts/sec
So you just add them up

You would use the combined rate when they've given you the number of hours each machine has
taken to complete a task
Join the discussion

by m3tm4n » Sun Nov 13, 2011 5:06 am
I've used the working problem equation: 1/A + 1/B = 1/T

Inserted as follows:
100/20s + 120/40s = 200/x
Search for x
320/40s = 200/x
x= 25s.
Join the discussion

by Abhishek009 » Sun Nov 13, 2011 6:30 am
Thouraya wrote:Machine A produces bolts at a uniform rate of 120 every 40 seconds, and Machine B produces bolts at a uniform rate of 100 every 20 seconds. If the two machines run simultaneously, how many seconds will it take for them to produce a total of 200 bolts?

Answer: By calculation, we find out that Machine A produces 3 bolts/sec, and Machine B produces 5 bolt/sec.

[/b]
Efficiency of machine A is - 3 bolts/sec

Efficiency of machine B is - 5 units/sec


Togather they produce 8 bolts/sec


Time taken to produce 200 bolts is 200/8 = 100/4 => 25 seconds...
Abhishek
Join the discussion