BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATBootcamp Starts Sep 28
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE BOOTCAMP

Live Online Bootcamp Class with Top GMAT Expert Chris Peckover

15 live classes from Sep 28, 2026

Schedule
Mon to Fri · 7:00 to 10:00 PM ET
Included
Live classes + 6 months of TTP OnDemand
  • Boost your GMAT score in less than one month in a live online class
  • 6 months access to TTP OnDemand video courses included
View bootcamp & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Median Coffee blend

Expert replies
by kulksnikhil » Fri Dec 01, 2006 2:50 am
#1 What is the median number of employees assigned per project for the projects at Company Z?

1) 25% of the projects at Company Z have 4 or more employees assigned tto each project
2) 35% of the projects at Company Z have 2 or fewer employees assigned to each project


#2 One Kilogram of a certain coffee blend consists of X kilogram of Type I coffee and y kilogram of Type II coffee. The cost of the blend is C dollars per kilogram, where C=6.5x + 8.5y. Is x<0.8
1) y>0.15
2) C>= 7.3
Join the discussion
Source: — Data Sufficiency |

Re: Median Coffee blend

by aim-wsc » Fri Dec 01, 2006 4:53 am
kulksnikhil wrote:#1 What is the median number of employees assigned per project for the projects at Company Z?

1) 25% of the projects at Company Z have 4 or more employees assigned tto each project
2) 35% of the projects at Company Z have 2 or fewer employees assigned to each project
interesting problem.

higher end has 25%
and lower end has 35% of average number of employees.
so there still will be 40% (which comes in the middle of two extremes) of projects which have exact threee employees assigned.

therefore median has to be 3 fit in 35% to 75% of ^ave.-persons-per-project^
ANSWER: both alone are not sufficient but together sufficient.
Join the discussion

Re: Median Coffee blend

by aim-wsc » Fri Dec 01, 2006 5:37 am
kulksnikhil wrote: #2 One Kilogram of a certain coffee blend consists of X kilogram of Type I coffee and y kilogram of Type II coffee. The cost of the blend is C dollars per kilogram, where C=6.5x + 8.5y. Is x<0.8
1) y>0.15
2) C>= 7.3
EDIT: WRONG INADEQUATE/ WRONG EXPLANATION AHEAD
2#
AGAIN interesting problem.
check ( cautious) while dealing with ^IS^ & yes or no type of problems: they are notorious. :)

clearly single inequalities are not sufficient to have a solution.

so if we take both of given conditions simultaneously::::

we can check the formula by putting extreme values.
note that the given data has y is greater than 0.15 while
required problem asks us to check whether x is less than 0.8

(....that clearly tells us the answer as E)

still we should substitute some random value to x and y.
note that x+y=1 kg.

AND therefore refer to the following post.
thankyou.
Last edited by aim-wsc on Tue Dec 05, 2006 8:19 pm, edited 1 time in total.
Join the discussion

Re: Median Coffee blend

by projase » Tue Dec 05, 2006 3:31 pm
I am not sure about your answer...

Consider that C=6.5X+8.5Y>=7.3 and X+Y=1

Then 6.5X+(1-X)8.5>=7.3
1.2>=2X
0.6>=X, meaning that "B" is correct...

Please comment.


aim-wsc wrote:
kulksnikhil wrote: #2 One Kilogram of a certain coffee blend consists of X kilogram of Type I coffee and y kilogram of Type II coffee. The cost of the blend is C dollars per kilogram, where C=6.5x + 8.5y. Is x<0.8
1) y>0.15
2) C>= 7.3
2#
AGAIN interesting problem.
check ( cautious) while dealing with ^IS^ & yes or no type of problems: they are notorious. :)

clearly single inequalities are not sufficient to have a solution.

so if we take both of given conditions simultaneously::::

we can check the formula by putting extreme values.
note that the given data has y is greater than 0.15 while
required problem asks us to check whether x is less than 0.8

(....that clearly tells us the answer as E)

still we should substitute some random value to x and y.
note that x+y=1 kg.

answer : together both taken insufficient.
Join the discussion

by aim-wsc » Tue Dec 05, 2006 8:13 pm
thanks for pointing out that buddy. :)

i missed that point. :shock:
Join the discussion