BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Water Pump Problem

Expert replies
by RickH » Sun Aug 15, 2010 7:08 pm
Please help me with the following problem:

Two Water pumps working simultaneously at their respective rates, took exactly 4 hours to fill a certain swimming pool. If the constant rate of one pump was 1.5 times the constant rate of the other, how many hours would it have taken the faster pump to fill the pool if it had worked alone at its constant rate?
Join the discussion
Source: — Problem Solving |

by Gurpinder » Sun Aug 15, 2010 7:22 pm
whats the official answer?

I get 10 hours? If this is right then I'll explain my approach!
"Do not confuse motion and progress. A rocking horse keeps moving but does not make any progress."
- Alfred A. Montapert, Philosopher.
Join the discussion

by RickH » Sun Aug 15, 2010 8:16 pm
That Sounds about right.
Join the discussion

by vijaynaik » Sun Aug 15, 2010 11:27 pm
[rate pump1 + rate of pump2 ] = 1/T;
1/x + 1/1.5x = 1/4;
x = 20/3;
so the faster pump can do it in 1.5 * 20/3 = 10 hrs;
Join the discussion

by RickH » Mon Aug 16, 2010 5:13 am
vijaynaik wrote:[rate pump1 + rate of pump2 ] = 1/T;
1/x + 1/1.5x = 1/4;
x = 20/3;
so the faster pump can do it in 1.5 * 20/3 = 10 hrs;
What do you use for the common denominator?
Join the discussion

by GMATGuruNY » Mon Aug 16, 2010 6:15 am
RickH wrote:Please help me with the following problem:

Two Water pumps working simultaneously at their respective rates, took exactly 4 hours to fill a certain swimming pool. If the constant rate of one pump was 1.5 times the constant rate of the other, how many hours would it have taken the faster pump to fill the pool if it had worked alone at its constant rate?
An easy approach would be to plug in a value for the rate of each pump:

Slow pump = 2/hour
Fast pump = (1.5)*2 = 3/hour
Combined rate = 2+3 = 5/hour
Work = rate*time = 5*4 = 20 (the value of the pool)
Time for faster pump = work/rate = 20/3.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by RickH » Mon Aug 16, 2010 6:57 am
GMATGuruNY wrote:
RickH wrote:Please help me with the following problem:

Two Water pumps working simultaneously at their respective rates, took exactly 4 hours to fill a certain swimming pool. If the constant rate of one pump was 1.5 times the constant rate of the other, how many hours would it have taken the faster pump to fill the pool if it had worked alone at its constant rate?
An easy approach would be to plug in a value for the rate of each pump:

Slow pump = 2/hour
Fast pump = (1.5)*2 = 3/hour
Combined rate = 2+3 = 5/hour
Work = rate*time = 5*4 = 20 (the value of the pool)
Time for faster pump = work/rate = 20/3.
I have not though of solving the problem in this fashion. Does this work for every problem of this kind?
Join the discussion

by vijaynaik » Mon Aug 16, 2010 10:18 am
i should have checked my answer before i confirmed it :)

Thanks 'GMATGuruNY' for the easier approach.
Join the discussion

by gmatmachoman » Mon Aug 16, 2010 10:28 am
Gurpinder wrote:whats the official answer?

I get 10 hours? If this is right then I'll explain my approach!
A small suggestion here : Plz share ur work so that certainly improves ur confi and makes others to help u out if u make any mistakes...

It wont take minutes to post ur explanation which at end of day gonna help u and the community...

Plz excuse me if i am way off limits...
Coming to the problem,

Let A take X hours to pump

B is the faster pump and it is 1.5 time efficient than A
so B shall take 2/3 of X hours

So we shall calculate how much of water would have been pumped in 1 hour

1/X + 1/(2/3)X = 1/4

1/X + (3/2X) = 1/4
Solving for x ; X = 10

we know that B is faster and it takes (2/3) * 10 = 6.67 hrs alone
Join the discussion

by Gurpinder » Mon Aug 16, 2010 10:33 am
gmatmachoman wrote:
Gurpinder wrote:whats the official answer?

I get 10 hours? If this is right then I'll explain my approach!
A small suggestion here : Plz share ur work so that certainly improves ur confi and makes others to help u out if u make any mistakes...

It wont take minutes to post ur explanation which at end of day gonna help u and the community...

Plz excuse me if i am way off limits...
NP. Your excused. :D

I used the table method. I am using a library computer so I don't really have access to a program where I can make that chart otherwise I'd post it here.
"Do not confuse motion and progress. A rocking horse keeps moving but does not make any progress."
- Alfred A. Montapert, Philosopher.
Join the discussion

by vijaynaik » Mon Aug 16, 2010 10:46 am
@GMATGuruNY, is this approach correct?

4 * [x + 1.5x] = 1;
10x =1; x = 1/10; fatster machine rate 3/2 * 1/10 = 3/20; So it can do it in 20/3 hours.

Thanks
Join the discussion

by HPengineer » Mon Aug 16, 2010 11:09 am
Vijaynaik,

That is the same approach i used... However i really like Rick H approach... but damn i never spot when to use the smart numbers on these problems... Oh well just need to keep practicing!!
Join the discussion

by vijaynaik » Mon Aug 16, 2010 12:30 pm
HPengineer, that's why i want to make sure my original approach is correct. It will be useful when we don't know or forget to plugin numbers even after lot of practice.

By looking at the solution given by GMATGuruNY, it appears that my approach is correct[ W = Rate * Time].
In my 1st example I inverted the rates x and 1.5x where as i shouldn't have done that becuase x is already a RATE and not in hours.

Thanks
Join the discussion

by sanjeevsinha01 » Wed Aug 18, 2010 11:19 am
RickH wrote:Please help me with the following problem:

Two Water pumps working simultaneously at their respective rates, took exactly 4 hours to fill a certain swimming pool. If the constant rate of one pump was 1.5 times the constant rate of the other, how many hours would it have taken the faster pump to fill the pool if it had worked alone at its constant rate?

Let 2 pumps are A and B .

A takes X h to fill.
As B is 1/2 times faster then A hence it will take 1/3h less time to fill .
Hence B will take 2X/3 h .
now As given .... 1/x + 3/2x = 1/4 .
X=10 .

hence B (faster one ) will take 2*10/3 h = 20/3 h to fill.


Sanjeev
sanjeev sinha
Join the discussion