Jane can paint the wall in J hours, and Bill can paint the same wall in B hours. They begin at noon together. If J and B are both even numbers is J=B?
(1) Jane and Bill finish at 4:48 p.m.
(2) (J+B)²=400
1) Jane and Bill takes 4 hrs 48 min = 24/5 hrs
in one hr 1/J + 1/B = J + B / JB , complete work in JB/(J+B) = 24/5
If J = B then JB/(J+B) = J²/2J = J/2 but since J is even J/2 should be an integer , which 24/5 is not. Sufficient to say J <>B.
2) (J+B)² = 400 = J+B = 20 cannot say J = B , diff possibilities even if J and B are even (4,16), (6, 14) (8, 12)
. Insufficient
1) and 2) together JB/(J+B) = 24/5 , J+B = 20 or JB/20 = 24/5 , JB = 24X4 = 96 if J = B, J² = 96 not a perfect square.
so J <> B , in fact of J and B are 12 and 8 but it is not imp to calculate in DS.
IMO A
Last edited by
kstv on Thu Mar 04, 2010 4:02 am, edited 1 time in total.