BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATBootcamp Starts Sep 21
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE BOOTCAMP

Live Online Bootcamp Class with Top GMAT Expert Chris Peckover

Sep 21 to Oct 9, 2026

Schedule
Mon to Fri · 7:00 to 10:00 PM ET
Included
Live classes + 6 months of TTP OnDemand
  • Boost your GMAT score in less than one month in a live online class
  • 6 months access to TTP OnDemand video courses included
View bootcamp & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Time and Work-GMAT Notes

Expert replies
by uibiravin » Sat Aug 08, 2009 10:15 am
Takes you to places where you belong.


© ENTRANCEGURU.COM Private Limited fab58bf5-62fc-4671-a172-31cd0b11e026.doc - 1 -
TIME AND WORK

Points for recapitulation while solving problems on time and work: 1.

If a person can do a piece of work in ‘m’ days, he can do
m
1
of the work in 1 day. 2.

If the number of persons engaged to do a piece of work be increased (or decreased) in a certain ratio the time required to do the same work will be decreased (or increased) in the same ratio. 3.

If A is twice as good a workman as B, then A will take half the time taken by B to do a certain piece of work. 4.

Time and work are always in direct proportion. 5.

If two taps or pipes P and Q take ‘m’ and ‘n’ hours respectively to fill a cistern or
tank, then the two pipes together fill




n
1m
1
part of the tank in 1 hour and the entire tank is filled in
nm
mnn
1m
1
1


hours.
Examples:

1. If 12 man can do a piece of work in 36 days. In how many days 18 men can do the same work? Solution:
12 men can do a work in 36 days. 18 men can do the work in
3618
12

= 24 days. Note:
If the number of men is increased, the number of days to finish the work will decrease. 2.

A and B can finish a work in 12 days. B and C can finish the same work in 18 days. C and A can finish in 24 days. How many days will take for A, B and C combined together to finish the same amount of work? Solution:
A and B can finish the work in 12 days. (A+B) Can finish in 1 day
12
1
of the work. Similarly (B+C) can finish in
18
1
of the work. (C+A) can finish in
24
1
of the work. 2(A+B+C) can finish in 1 day (
)24
118
112
1

of the work. =
72
1372
346


of the work. (A+B+C) can finish in 1 day =
144
13
of the work. Takes you to places where you belong.


© ENTRANCEGURU.COM Private Limited fab58bf5-62fc-4671-a172-31cd0b11e026.doc - 2 -


(A+B+C) can together finish the work in
13
144
=
13
111
days. 3.

A, B and C earn Rs.120 per day while A and C earn Rs.80 per day and B and
C earn Rs.66 per day. Find C’s earning only.
Solution:
(A+B+C) earn per day Rs.120

(1) (A+C) earn per day Rs.80

(2) (B+C) earn per day Rs.66

(3) From (1) and (2), we find that C earns Rs.40 From (3) we get, That B earns 26 since C earns Rs.40 4.

4 men or 8 women can do a piece of work in 24 days. In how many days, will 12 men and 8 women do the same work? Solution:
4 men = 8 women can do a work in 24 days. 1 man or 2 women in one day can finish
24
1
of the work. Now 12 men and 8 women together will do the work as 16 men alone can do the work. 16 men can do in one day =
3
224
16

of the work. 16 men can do the entire work in
2
3
or
2
11
days. 5. A and B can finish a work in 16 days, while A alone can do the same work in 24 days. In how many days, B alone can finish the same work? Solution:
A and B can finish a work in 16 days. (A+B) can finish in one day
16
1
of the work. A alone can finish in one day
24
1
of the work. The amount of work that B alone can do in one day
48
148
2324
116
1


of the work. B alone can complete the work in 48 days. 6. A and B can do a piece of work in 12 days. B and C can do it in 20 days. If A is twice as good a workman as C, then in what time will B alone do it? Solution:
(A+B) can do a work in 12 days. (A+B) in one day can do
12
1
of the work

(1) Similarly (B+C) in one day can do
20
1
of the work

(2) Since A=2C, in (1) put A=2C

(2C+B) in one day can do
12
1
of the work. Takes you to places where you belong.


© ENTRANCEGURU.COM Private Limited fab58bf5-62fc-4671-a172-31cd0b11e026.doc - 3 -
i.e., [(B+C)+C] in one day can do
12
1
of the work. C alone can do in one day
20
112
1

=
30
160
260
35


of work

(3) From (2), using (3), B alone can do in one day
60
160
2330
120
1


of work.

B alone can do the entire work in 60 days. 7. A contractor undertook to do a piece of work in 125 days and employs 175 men to carry out the job, but after 40 days, he finds that one a quarter of the work had been carried out. How many more men should be employed to finish the work in time? Solution:
Men Days Work 175 40
4
1
?(x) 85
4
3
x= 175


85
40



4
1
4
3
= 247 (247

175) or 72 men will have to be employed. 8. B is twice as fast as A and C is twice as fast as B. If A alone can complete the job in 28 days, how many days will A, B and C take to complete the job working together? Solution:
Given B = 2A C= 2B (efficiency-wise) A can complete the work in 28 days (given)

B alone can complete the work in 14 days [

B is twice as fast as A] Hence, C alone can complete the work in 7 days [

C is twice as fast as B] (A+B+C) working together can complete



7
114
128
1
part of the work in 1 day. =
4
128
728
421


of the work in one day.

(A+B+C) working together can complete the entire work in 4 days. 9. A cistern is normally filled in 6 hours, but takes 2 hours more to fill it because of a leak at its bottom. If the cistern is full, how long will it take for the leak to empty the cistern? Solution:
Takes you to places where you belong.


© ENTRANCEGURU.COM Private Limited fab58bf5-62fc-4671-a172-31cd0b11e026.doc - 4 -
The cistern is filled in 6 hours.

In 1 hour
6
1
of the cistern will be filled. Due to a leak in the cistern, in 1 hour
8
1
of the cistern only is filled.

Leakage in 1 hour =
24
124
348
16
1


of the cistern.
24
1
of the cistern is leaked out in 1 hour. The entire cistern will become empty in 24 hours. 10. Two pipes A and B are attached to a cistern. Pipe A can fill the cistern in 6 hours while pipe B can empty it in 8 hours. When both the pipes are opened together, find the time for filling the cistern. Solution:
Pipe A fills in an hour =
6
1
of the cistern. Pipe B empties in one hour
8
1
of the cistern. In 1 hour, the portion of the cistern filled =
24
18
16
1



Time taken to fill the cistern = 24 hours. 11. The efficiency of the first machine tool is 20% less than that of the 2
nd
one. The first machine tool operated for 5 hours, whereas, the second one operated for 4 hours and together they machined 4000 work pieces. Find the number of work-pieces machined by the first machine tool. Solution:
Efficiency of the two machine tools = 80: 100 = 4: 5 Time ratio of the two machine tools = 5: 4

Work ratio of the two machine tools = 4

5: 5

4 = 20: 20 = 1: 1 Thus both the machine tools produced the same number of work-pieces Viz.,
20002
4000

Alternative: The second machine operating for 4 hours = first machine operating for 5 hours. Hence the first machine would produce 4000 pieces in 10 hours. In 5 hours it would have produced 2000 pieces. 12. Two coal loading trucks handle 9000 tonnes of coal at an efficiency of 90% working 12 hours per day for 8 days. How many hours a day, 3 coal loading trucks should work at an efficiency of 80% so as to load 12000 tonnes of coal in 6 days. Solution:
Takes you to places where you belong.


© ENTRANCEGURU.COM Private Limited fab58bf5-62fc-4671-a172-31cd0b11e026.doc - 5 -
No of lorries

Efficiency

Hours of
work per day

No of days.

Tonnes

2

90%

12

8

9000

3

80%

? =X

6

12000

X=
129000
120006
880
903
2

= 16 hours.
Join the discussion
Source: — GMAT Strategy |