BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

water pumps

Expert replies
by LevelOne » Mon Jun 22, 2009 11:20 am
Two water pumps, working simultaneously at their respective constant rates, took exactly 4 hours to fill a certain swimming pool. If the constant rate of one pump was 1.5 times the constant rate of the other, how many hours would it have taken the faster pump to fill the pool if it had worked alone at its constant rate?

a. 5
b. 16/3
c. 11/2
d. 6
e. 20/3

thanks!
Join the discussion
Source: — Problem Solving |

by truplayer256 » Mon Jun 22, 2009 11:38 am
Let's call the two pumps Pump A and Pump B. Pump A has a rate of x and Pump B has a rate of 1.5(x). Using the formula:

1/Rate of Pump A to fill the pool + 1/ Rate of Pump B to fill the pool = 1/ Rate of Pump A and B together to fill the pool.

1/x+1/1.5(x)=1/4

5(x)/2=3(x^2)/8

3(x^2)/8-5x/2=0

x(3x/8-5/2)=0

x=0, x=20/3

Our answer should be 20/3 or E.
Join the discussion

by LevelOne » Mon Jun 22, 2009 11:53 am
thanks, the answer is E.

what exactly did you do to 1/x+1/1.5(x)=1/4 to arrive at
5(x)/2=3(x^2)/8 ?

I started off the same way but my solution is somehow different...

Also, how would you solve this one:

Six machines, each working at the same constant rate, together can complete a certain job in 12 days. How many additional machines, each working at the same constant rate, will be needed to complete the job in 8 days?

a. 2
b. 3
c. 4
d. 6
e. 8
Join the discussion

by truplayer256 » Mon Jun 22, 2009 12:05 pm
what exactly did you do to 1/x+1/1.5(x)=1/4 to arrive at
5(x)/2=3(x^2)/8 ?
well, I pretty much multiplied the 1.5(x) to the one and the x to the one to get 1.5(x)+x, and then multiplied the denominators together because we're adding two fractions. So then you get 2.5(x)/1.5x^(2)=1/4. Multiply both sides by 1.5x^2 and you get 2.5(x)=3x^2/2/(4)=5x/2=3x^2/8. Hope that helped.

-------------------------------------------------------------
Six machines, each working at the same constant rate, together can complete a certain job in 12 days. How many additional machines, each working at the same constant rate, will be needed to complete the job in 8 days?
Since it takes 12 days for 6 machines to complete a certain job, it'll take 12*6 or 72 days for one machine to complete the job. Now we know that 1/9 of 72 is 8, right? so we need 9 machines to complete the job in 8 days. Since the question is asking you for how many additional machines are needed to complete the job in 8 days, the answer to this question will be 9-6=3 additional machines.
Join the discussion

by LevelOne » Mon Jun 22, 2009 12:10 pm
that's great! thanks
Join the discussion

Re: water pumps

by Stuart@KaplanGMAT » Mon Jun 22, 2009 1:36 pm
LevelOne wrote:Two water pumps, working simultaneously at their respective constant rates, took exactly 4 hours to fill a certain swimming pool. If the constant rate of one pump was 1.5 times the constant rate of the other, how many hours would it have taken the faster pump to fill the pool if it had worked alone at its constant rate?

a. 5
b. 16/3
c. 11/2
d. 6
e. 20/3

thanks!
I solved intuitively rather than using an equation.

I thought to myself, "Self, one pump is 1.5 times faster than the other. So, for every 1 unit of work done by slow pump, fast pump is doing 1.5 units of work. Or, put another way, that fast pump is doing 1.5/(1.5+1) of the work.

So Self, what does that mean? It means that fast pump is doing 1.5/2.5 or 3/5 of the work.

Self, myself is pondering, how does that help? Well, Self, if it's doing 3/5 of the work, then if it had to work all alone (which it might enjoy, given how slow that other pump is), then it's going to take 5/3 of the time to get the job done.

Aha! says myself, finally caught up on things... so I simply multiply:

4hours * 5/3 = 20/3 hours and select choice E!"
Image

Stuart Kovinsky | Kaplan GMAT Faculty | Toronto

Kaplan Exclusive: The Official Test Day Experience | Ready to Take a Free Practice Test? | Kaplan/Beat the GMAT Member Discount
BTG100 for $100 off a full course
Join the discussion

by pops » Mon Jun 22, 2009 9:09 pm
aha...thats really cool !!
I was going by the method mentioned first above.. and it takes quite some time to solve the equation.. this way we can save lot time...
Join the discussion