BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Algebra & Manufacturer

Expert replies
by jaimito01 » Tue Mar 24, 2009 4:31 pm
A manufacturer can save x dollars per unit in production costs by overproducing in certain seasons. If storage costs for the excess are y dollars per unit per day ( x > y ), which of the following express the maximum number of days that n excess units can be stored before the storage costs exceed the savings on the excess units?

(a) x – y
(b) (x – y)n
(c) x/y
(d) xn/y
(e) x/yn

How do you get C?
Join the discussion
Source: — Problem Solving |

by Mustang » Tue Mar 24, 2009 5:40 pm
Following are given:

number of nits overproduced: n

dollars saved for each unit over produced: x

storage cost for each unit excess produced per day : y

Let us assume that in "D" days storage costs exceed the savings on the excess units

total saving on excess units : nx

total expense per day on excess storage : ny

total expense for D days on excess storage: nyD

we want to find D when

nx=nyD

D=x/y

IMO C
Join the discussion

Re: Algebra & Manufacturer

by Vemuri » Tue Mar 24, 2009 6:36 pm
With such questions, I generally prefer plugging in values & check with the answer choices. This approach saves times & avoids any algerbriac errors you might make when running against time.

Lets us assume that:
1. saving on each excess unit is $10 (x=10)
2. 10 excess units (n=10)
3. storage costs per day per unit is $1 (y=1).

Savings for the excess units by means of storage is: $100 ($10 * 10units)

For the excess units, the storage cost is: $10 per day (10 units * $1).

So, for the storage cost to exceed the savings, the number of days required is: 100/10 = 10days. We need to look for this answer in the choices.

A. 9
B. 90
C. 10 (our answer)
D. 100
E. 1

Hope this helps.
Join the discussion

Re: Algebra & Manufacturer

by Ossa » Wed Mar 25, 2009 5:14 am
I think if you step back a second and think about this, you would be able to find the answer quickly. If we save $x per unit and lose $y/day per unit, then you need x/y days to breakeven.
Remark: as a double check you can also exclude all the options with n, since both x and y are in dollars per unit so this variable should not show in the answer, so now you are only left with a & c.
jaimito01 wrote:A manufacturer can save x dollars per unit in production costs by overproducing in certain seasons. If storage costs for the excess are y dollars per unit per day ( x > y ), which of the following express the maximum number of days that n excess units can be stored before the storage costs exceed the savings on the excess units?

(a) x – y
(b) (x – y)n
(c) x/y
(d) xn/y
(e) x/yn

How do you get C?
Ossa Elhadary, PhD, CISA, PMP
Math Specialist
Test Prep New York
maximize your score, minimize your stress

www.testprepny.com
[email protected]
Join the discussion