BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

GMAT PREP????

Expert replies
by dferm » Mon Mar 24, 2008 12:38 pm
A company has two types of machines, type R and type S. Operating at a constant rate, a machine of type R does a certain job in 36 hours and a machine of type S does the same job in 18 hours. If the company used the same number of each type of machine to do the job in 2 hours, how many machines of type R were used?

A. 3
B. 4
C. 6
D. 9
E. 12
Join the discussion
Source: — Problem Solving |

by xilef » Mon Mar 24, 2008 12:58 pm
using work formula to find the time it takes for both machines to do the same work:

(18*36)/54=12 hrs for both machines to complete the job

2 hrs is 6 times faster so the company needs 6 of each to do it in 12hr.

Answer C.
Join the discussion

by preciousrain7 » Mon Mar 24, 2008 1:47 pm
xilef wrote:using work formula to find the time it takes for both machines to do the same work:

(18*36)/54=12 hrs for both machines to complete the job

2 hrs is 6 times faster so the company needs 6 of each to do it in 12hr.

Answer C.
Can you give more explanation for the last step please? Thanks!
Join the discussion

by xilef » Mon Mar 24, 2008 2:04 pm
It takes both working together (one of each machine) to do the job in 12hrs. The company used the same number of each type of machine to do the job in 2 hours, which is 6 times faster than the the time it takes one of each machine to do the job, therefore, company used 6 of each.
Join the discussion

by preciousrain7 » Mon Mar 24, 2008 2:31 pm
xilef wrote:It takes both working together (one of each machine) to do the job in 12hrs. The company used the same number of each type of machine to do the job in 2 hours, which is 6 times faster than the the time it takes one of each machine to do the job, therefore, company used 6 of each.
thanks!
Join the discussion

by daduck112 » Mon Jul 07, 2008 12:09 pm
another way to look at things...

R does 1/36 the job

S does 1/18 the job

R+S = 1/12 the job or 12 hours to do 1 job

you want to do it in 2 hours....

so you you'll 12/2 = {6 machines each.}
Join the discussion

by AleksandrM » Mon Jul 07, 2008 3:05 pm
1/36 + 1/18 = 1/12 so together they can do 1 job in 12 hours. Then, I set up the following equation:

2/1/12 = x/1/2 [translation: if 2 machines complete 1 job in 12, then how many machines will complete 1 job in 2 hours?]

24 = 2x

x = 12 machines, 6 of each type.
Join the discussion

by vittalgmat » Tue Sep 08, 2009 10:56 am
This is an interesting problem which can be solved in another way(rather a cryptic way). Thought of sharing this.
let the n be the number of machines.
We know the rates of the machines as 1/36 and 1/18.
Both working together for 2 hrs will do
2/36 + 2/18 amount of work.
Now we know n machines finished the work in 2 hrs.
So the equation will be
n*(2/36 + 2/18) = 1 (=1 coz the work got completed).
(This is the famous Logitech approach)

solving n = 6

HT Helps
Join the discussion