A production facility that requires its air to be free of particulate matter requires staff and visitors to enter the production floor by way of a single hallway that is interrupted at each of three points by a changing room. In each room, an entrant must change into a new lab jacket, a hat, and new clean shoe coverings after the room is blasted with air. The facility intends to speed up the process of entering the production facility by replacing the three rooms with two changing rooms of a new design whose method of blasting air is effective enough to maintain the required air quality.

Which of the following would be most important to know in determining whether the production facility's plan, if implemented, is likely to achieve its goal?

1. Whether the initial cost of the replacement and the additional cost of maintaining the new rooms over time is less than the additional earnings generated from time saved in the new process
2. Whether the time it will take to make the installation is worth the time that the installation will save
3. Whether the air blasting technique takes equal time in the current design of room and in the new design
4. Whether yet another air blasting technique would eliminate the need to wear lab jackets, hats, and clean shoe coverings
5. Whether staff and visitors also exit the production floor through the same changing rooms

Can some experts explain the best option?

OA C
Source: — Critical Reasoning |

Legendary Member
Posts: 2214
Joined: Fri Mar 02, 2018 2:22 pm
Followed by:5 members

by deloitte247 » Wed Aug 15, 2018 10:38 am

Timer

00:00

Your Answer

A

B

C

D

E

Global Stats

Option A - INCORRECT.
There would have been a review of the cost effectiveness of the new replacement and the cost of maintenance of the new rooms to be cost effective also it should be less than the additional earnings generated from time saved in the new process.

Option B - INCORRECT.
For the organization to have decided to install a new technique, definitely the time it will take to make the installation should worth the time that the installation will save.

Option C - CORRECT.
For a new technique to be installed, it would have pass through lots of deliberation and the advantage would certainly be more than the disadvantage, however the air blasting technique would take equal time in the current design of room and in the new design compared to the old air blasting technique. Also would be effective enough to maintain the required air quality.

Option D - INCORRECT.
It is possible that the new air blasting technique would eliminate the need to wear lab jackets, hats, and clean shoe coverings and also would be effective enough to maintain the required air quality.

Option E - INCORRECT.
There is a possibility that both staff and visitors would exit the production floor through the same changing rooms since its just two rooms that was created for passage and its a one way hallow way.