BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Combined Work Problem

Expert replies
by JScherman » Thu May 08, 2014 9:23 am
Can't seem to figure this one out....

Each of 10 machines works at the same constant rate doing a certain job. The amount of the time needed by the 10 machines working together, to complete the job is 16 hours. How many hours would be needed if only 8 of the machines, working together, were used to complete the job?

A. 18
B. 20
C. 22
D. 24
E. 26
Join the discussion
Source: — Problem Solving |

by Brent@GMATPrepNow » Thu May 08, 2014 9:34 am
JScherman wrote:.

Each of 10 machines works at the same constant rate doing a certain job. The amount of the time needed by the 10 machines working together, to complete the job is 16 hours. How many hours would be needed if only 8 of the machines, working together, were used to complete the job?

A. 18
B. 20
C. 22
D. 24
E. 26
The amount of the time needed by the 10 machines working together, to complete the job is 16 hours.
So, we can say that the job requires a total of 160 MACHINE HOURS (10 machines each working 16 hours = 160 machine hours)

How many hours would be needed if only 8 of the machines, working together, were used to complete the job?
We need to divide the work of 160 machine hours among the 8 machines.
160/8 = 20 hours

Answer: B

Cheers,
Brent

Here's a similar question to try: https://www.beatthegmat.com/work-problem-t275195.html
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by GMATGuruNY » Thu May 08, 2014 11:55 am
JScherman wrote:Can't seem to figure this one out....

Each of 10 machines works at the same constant rate doing a certain job. The amount of the time needed by the 10 machines working together, to complete the job is 16 hours. How many hours would be needed if only 8 of the machines, working together, were used to complete the job?

A. 18
B. 20
C. 22
D. 24
E. 26
PLUG IN approach:

Let the rate per machine = 1 unit per hour.
Rate for 10 machines = 10 units per hour.
In 16 hours, the amount of work produced by 10 machines = r*t = 10*16 = 160 units.
To produce 160 units, the time required by 8 machines = w/t = 160/8 = 20 hours.

The correct answer is B.

INVERSE PROPORTION approach:

The number of machines and the number of hours are INVERSELY PROPORTIONAL.
As the number of machines DECREASES, the number of hours must INCREASE, so that the same amount of work is produced in each case.
Thus, we can set up the following equation:
(number of machines)(number of hours) = (number of machines)(number of hours)

Since 10 machines require 16 hours, and we must determine how many hours will be required by 8 machines, we get:
10*16 = 8x
x = 20.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion