BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

need confirmation that this question was done correctly pls

Expert replies
by jzw » Fri Mar 16, 2012 8:46 pm
can someone please review this question and more specifically - the way i did it. i need confirmation that i solved the problem correctly. i know there are many many ways of solving rate problems; with respect - @ this point it's too late for me to learn new ways - just hoping an expert can follow the logic below and say whether i stumbled across the answer by accident or whether this is a correct way of solving this problem (note i said "a way" not "THE way"). thanks!

"Faucet 1 working alone can fill a tub in 20 minutes. Faucet 2 working alone can do the same job in 15 minutes. The hole at the bottom of the tub can empty a full tub in 30 minutes. If both faucets are working at their constant rates given above and the hole is not covered, how long does it take to fill an empty tub?"

(a) 5 minutes
(b) 6 minutes
(c) 10 minutes
(d) 12 minutes
(e) 20 minutes

Ok - here is now I did it:

R x T = W
1/3 x 3/1 = 1
1/4 x 4/1 = 1

After accounting for LCD, the combined rate is 7/12. Then we need to subtract 30 minutes (rate = 1/2) which is represented below (6/12).

Combined rate minue rate of loss:
7/12 - 6/12 = 1/12

So now, we're left with the combined rate plus the rate at which the hole is emptying water at 1/12, which means we need 12 minutes in order for the job do be done (see below).

R x T = W
1/12 x 12 = 1

So the answer is 12 minutes. The correct answer is 12 minutes - just want to make sure that I didn't get the correct answer "by accident" (which has happened to me on occasion. Rare, but it does happen.) Thanks again to whoever checks this.
Join the discussion
Source: — Problem Solving |

by LalaB » Fri Mar 16, 2012 10:25 pm
(1/20)+(1/15)-(1/30)=1/12

answ is 12
Happy are those who dream dreams and are ready to pay the price to make them come true.(c)

In order to succeed, your desire for success should be greater than your fear of failure.(c)
Join the discussion

by krusta80 » Sat Mar 17, 2012 6:32 am
jzw wrote:can someone please review this question and more specifically - the way i did it. i need confirmation that i solved the problem correctly. i know there are many many ways of solving rate problems; with respect - @ this point it's too late for me to learn new ways - just hoping an expert can follow the logic below and say whether i stumbled across the answer by accident or whether this is a correct way of solving this problem (note i said "a way" not "THE way"). thanks!

"Faucet 1 working alone can fill a tub in 20 minutes. Faucet 2 working alone can do the same job in 15 minutes. The hole at the bottom of the tub can empty a full tub in 30 minutes. If both faucets are working at their constant rates given above and the hole is not covered, how long does it take to fill an empty tub?"

(a) 5 minutes
(b) 6 minutes
(c) 10 minutes
(d) 12 minutes
(e) 20 minutes

Ok - here is now I did it:

R x T = W
1/3 x 3/1 = 1
1/4 x 4/1 = 1

After accounting for LCD, the combined rate is 7/12. Then we need to subtract 30 minutes (rate = 1/2) which is represented below (6/12).

Combined rate minue rate of loss:
7/12 - 6/12 = 1/12

So now, we're left with the combined rate plus the rate at which the hole is emptying water at 1/12, which means we need 12 minutes in order for the job do be done (see below).

R x T = W
1/12 x 12 = 1

So the answer is 12 minutes. The correct answer is 12 minutes - just want to make sure that I didn't get the correct answer "by accident" (which has happened to me on occasion. Rare, but it does happen.) Thanks again to whoever checks this.
I think you did, indeed, get lucky here unfortunately. Always remember to keep the units consistent...you chose to convert minutes to hours for some reason. All that does is confuse the issue. Here is your approach without switching to hours:

Faucet 1: 1 tub in 20 minutes -> 1/20 tub per minute
Faucet 2: 1 tub in 15 minutes -> 1/15 tub per minute
Hole: Minus 1 tub in 30 minutes -> -1/30 tub per minute

Net rate = 1/20+1/15-1/30 = 5/60 = 1/12 tubs per minute

12 minutes it is! :)


In your case, it looks like you took the times in minutes and converted them to hours:

1 tub in 20 minutes -> 1/3 hours/tub
1 tub in 15 minutes -> 1/4 hours/tub
-1 tub in 30 minutes -> -1/2 hours/tub

This step is fine but probably not the best use of time since they're looking for minutes in the end anyway (ALWAYS pay attention to units of measure when doing rate problems). Where you started to get off track is by skipping the next step: you never "flipped" to get the rate you WANT (in this case, tubs per hour).

Following this step, you would have gotten:

Faucet 1 -> 3 tubs per hour
Faucet 2 -> 4 tubs per hour
Hole -> -2 tubs per hour

Net rate = 3+4-2 = 5 tubs per hour

Now divide by 60 minutes/hour to get: 1/12 tubs per minute -> 12 minutes per tub
Join the discussion

by jzw » Sat Mar 17, 2012 10:05 am
thank you for once again lifting a cloud of confusion that i hadn't realized was there. i've been converting everything to fractions of an hour - and you're right, it's just a colossal waste of time, and it causes mistakes. i was about to post a problem seperately in another post, one in which i couldn't quite figure out why i was screwing it up - and then i tried it just keeping within the same units the problem gave and i did it correctly in under a minute. i'll post the question below and the easy way to solve it (rather than the complex fractions back and forth).

"When working alone, Dominic takes twice as much time as Nick does to mow the lawn. When working together, they can mow half of the same lawn in 15 minutes. How long does it take Dominic to mow the lawn by himself?"

(a) 90 minutes
(b) 60 minutes
(c) 45 minutes
(d) 30 minutes
(e) 20 minutes

R x T = W
x 1/2x = 1
x 1/x = 1
x 1/30 = 1

1/2x + 2/2x = 1/30
x = 45
2x = 90

answer = 90 minutes

(in the original way i had 30 minutes as 1/2 and i was going back and forth to minutes)
Join the discussion