BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
Vote for Target Test Prep, Newsweek Readers’ Choice Awards 2026
NEWSWEEK READERS’ CHOICE 2026

BIG NEWS! Target Test Prep has been nominated, and they’d love your vote!

TTP has worked incredibly hard to build the best test prep experience possible, and winning Newsweek’s 2026 Readers’ Choice Award for Best Test Prep would mean a lot to them. If TTP has helped you, they’d be incredibly grateful for your vote. You can vote once each day through September 9.

Vote for TTP
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Advanced Rates Problem: QR #173 PS

Expert replies
by tonebeeze » Sun Jan 16, 2011 5:27 pm
I usually do relatively well with rate problems, but this problem tripped me up. I would appreciate help mapping this problem out. Thanks!

Running at their respective constant rates, Machine X takes 2 days longer to produce w widgets than Machine Y. At these rates, if the two machines together produce 5/4w widgets in 3 days, how many days would it take Machine X alone to produce 2w widgets?

a. 4
b. 6
c. 8
d. 10
e. 12

OA: E
Join the discussion
Source: — Problem Solving |

by anshumishra » Sun Jan 16, 2011 5:44 pm
tonebeeze wrote:I usually do relatively well with rate problems, but this problem tripped me up. I would appreciate help mapping this problem out. Thanks!

Running at their respective constant rates, Machine X takes 2 days longer to produce w widgets than Machine Y. At these rates, if the two machines together produce 5/4w widgets in 3 days, how many days would it take Machine X alone to produce 2w widgets?

a. 4
b. 6
c. 8
d. 10
e. 12

OA: E
Total work = 2w
Lets say , y takes "t" time
y -> w work -> t time -> rate of y = w/t
x -> w work -> t+2 time -> rate of x = w/(t+2)

So,
w/(t+2) + w/t = 5w/(4*3) = 5w/12
=> (wt+wt+2w)/[t*(t+2)] = 5w/12
=> 2w(t+1)/[t*(t+2)] = 5w/12
=> 5t^2 + 10t -24t -24 = 0
=> 5t^2 - 14t - 24 = 0
=> t = 14+-√676/(10) = (14+26)/10 (discard -ve value) = 4

So, rate of x = w/6
So, time taken to complete 2w work = 2w/(w/6) = 12

E
Thanks
Anshu

(Every mistake is a lesson learned )
Join the discussion

by ankur.agrawal » Mon Jan 17, 2011 2:56 am
Is dere any other method?

Can we do it by picking answer options. ?
Join the discussion

by AIM GMAT » Mon Jan 17, 2011 3:16 am
Thanks anshumishra for a wonderful explanation of the problem .
Join the discussion

by GMATGuruNY » Mon Jan 17, 2011 4:50 am
tonebeeze wrote:I usually do relatively well with rate problems, but this problem tripped me up. I would appreciate help mapping this problem out. Thanks!

Running at their respective constant rates, Machine X takes 2 days longer to produce w widgets than Machine Y. At these rates, if the two machines together produce 5/4w widgets in 3 days, how many days would it take Machine X alone to produce 2w widgets?

a. 4
b. 6
c. 8
d. 10
e. 12

OA: E
An efficient way to solve this problem is to plug in a value for w and then plug in the answer choices.

Let w=12.
In 3 days, X and Y need to produce 5/4*w = 5/4*12 = 15 widgets.
The answer choices represent the time for X to produce 2w=24 widgets.

Answer choice C: 8 days for X to produce 24 widgets
Thus, X produces 12 widgets in 4 days.
Since X takes 2 days longer, Y produces 12 widgets in 4-2=2 days.
Rate for X = w/t = 12/4 = 3/day.
Rate for Y = w/t = 12/2 = 6/day.
Combined rate for X+Y = 3+6 = 9/day .
Work completed in 3 days = r*t = 9*3 = 27 widgets.
Incorrect. We need much less work to get done, so the time for X must be much longer.

Answer choice E: 12 days for X to produce 24 widgets
Thus, X produces 12 widgets in 6 days.
Since X takes 2 days longer, Y produces 12 widgets in 6-2=4 days.
Rate for X = w/t = 12/6 = 2/day.
Rate for Y = w/t = 12/4 = 3/day.
Combined rate for X+Y = 2+3 = 5/day.
Work completed in 3 days = r*t = 5*3 = 15 widgets. Success!

The correct answer is E.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by ankur.agrawal » Mon Jan 17, 2011 5:32 am
GMATGuruNY wrote:
tonebeeze wrote:I usually do relatively well with rate problems, but this problem tripped me up. I would appreciate help mapping this problem out. Thanks!

Running at their respective constant rates, Machine X takes 2 days longer to produce w widgets than Machine Y. At these rates, if the two machines together produce 5/4w widgets in 3 days, how many days would it take Machine X alone to produce 2w widgets?

a. 4
b. 6
c. 8
d. 10
e. 12

OA: E
An efficient way to solve this problem is to plug in a value for w and then plug in the answer choices.

Let w=12.
In 3 days, X and Y need to produce 5/4*w = 5/4*12 = 15 widgets.
The answer choices represent the time for X to produce 2w=24 widgets.

Answer choice C: 8 days for X to produce 24 widgets
Thus, X produces 12 widgets in 4 days.
Since X takes 2 days longer, Y produces 12 widgets in 4-2=2 days.
Rate for X = w/t = 12/4 = 3/day.
Rate for Y = w/t = 12/2 = 6/day.
Combined rate for X+Y = 3+6 = 9/day .
Work completed in 3 days = r*t = 9*3 = 27 widgets.
Incorrect. We need much less work to get done, so the time for X must be much longer.

Answer choice E: 12 days for X to produce 24 widgets
Thus, X produces 12 widgets in 6 days.
Since X takes 2 days longer, Y produces 12 widgets in 6-2=4 days.
Rate for X = w/t = 12/6 = 2/day.
Rate for Y = w/t = 12/4 = 3/day.
Combined rate for X+Y = 2+3 = 5/day.
Work completed in 3 days = r*t = 5*3 = 15 widgets. Success!

The correct answer is E.
" We need much less work to get done, so the time for X must be much longer."

How do we know whether to move up or down from C OPTION. Pls explain.
Join the discussion

by GMATGuruNY » Mon Jan 17, 2011 5:40 am
ankur.agrawal wrote:
GMATGuruNY wrote:
tonebeeze wrote:I usually do relatively well with rate problems, but this problem tripped me up. I would appreciate help mapping this problem out. Thanks!

Running at their respective constant rates, Machine X takes 2 days longer to produce w widgets than Machine Y. At these rates, if the two machines together produce 5/4w widgets in 3 days, how many days would it take Machine X alone to produce 2w widgets?

a. 4
b. 6
c. 8
d. 10
e. 12

OA: E
An efficient way to solve this problem is to plug in a value for w and then plug in the answer choices.

Let w=12.
In 3 days, X and Y need to produce 5/4*w = 5/4*12 = 15 widgets.
The answer choices represent the time for X to produce 2w=24 widgets.

Answer choice C: 8 days for X to produce 24 widgets
Thus, X produces 12 widgets in 4 days.
Since X takes 2 days longer, Y produces 12 widgets in 4-2=2 days.
Rate for X = w/t = 12/4 = 3/day.
Rate for Y = w/t = 12/2 = 6/day.
Combined rate for X+Y = 3+6 = 9/day .
Work completed in 3 days = r*t = 9*3 = 27 widgets.
Incorrect. We need much less work to get done, so the time for X must be much longer.

Answer choice E: 12 days for X to produce 24 widgets
Thus, X produces 12 widgets in 6 days.
Since X takes 2 days longer, Y produces 12 widgets in 6-2=4 days.
Rate for X = w/t = 12/6 = 2/day.
Rate for Y = w/t = 12/4 = 3/day.
Combined rate for X+Y = 2+3 = 5/day.
Work completed in 3 days = r*t = 5*3 = 15 widgets. Success!

The correct answer is E.
" We need much less work to get done, so the time for X must be much longer."

How do we know whether to move up or down from C OPTION. Pls explain.

When w=12, X and Y must produce in 3 days 5/4*w = 5/4*12 = 15 widgets.
Answer choice C resulted in the production of 27 widgets, a much higher number.
To reduce the number of widgets produced, we need X to work more slowly.
To work more slowly means to take more time, so we need a bigger answer choice.
Last edited by GMATGuruNY on Mon Jan 17, 2011 3:53 pm, edited 1 time in total.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by anshumishra » Mon Jan 17, 2011 6:18 am
AIM GMAT wrote:Thanks anshumishra for a wonderful explanation of the problem .
Thanks AIM GMAT!
Thanks
Anshu

(Every mistake is a lesson learned )
Join the discussion

by ankur.agrawal » Mon Jan 17, 2011 6:34 am
GMATGuruNY wrote:
ankur.agrawal wrote:
GMATGuruNY wrote:
tonebeeze wrote:I usually do relatively well with rate problems, but this problem tripped me up. I would appreciate help mapping this problem out. Thanks!

Running at their respective constant rates, Machine X takes 2 days longer to produce w widgets than Machine Y. At these rates, if the two machines together produce 5/4w widgets in 3 days, how many days would it take Machine X alone to produce 2w widgets?

a. 4
b. 6
c. 8
d. 10
e. 12

OA: E
An efficient way to solve this problem is to plug in a value for w and then plug in the answer choices.

Let w=12.
In 3 days, X and Y need to produce 5/4*w = 5/4*12 = 15 widgets.
The answer choices represent the time for X to produce 2w=24 widgets.

Answer choice C: 8 days for X to produce 24 widgets
Thus, X produces 12 widgets in 4 days.
Since X takes 2 days longer, Y produces 12 widgets in 4-2=2 days.
Rate for X = w/t = 12/4 = 3/day.
Rate for Y = w/t = 12/2 = 6/day.
Combined rate for X+Y = 3+6 = 9/day .
Work completed in 3 days = r*t = 9*3 = 27 widgets.
Incorrect. We need much less work to get done, so the time for X must be much longer.

Answer choice E: 12 days for X to produce 24 widgets
Thus, X produces 12 widgets in 6 days.
Since X takes 2 days longer, Y produces 12 widgets in 6-2=4 days.
Rate for X = w/t = 12/6 = 2/day.
Rate for Y = w/t = 12/4 = 3/day.
Combined rate for X+Y = 2+3 = 5/day.
Work completed in 3 days = r*t = 5*3 = 15 widgets. Success!

The correct answer is E.
" We need much less work to get done, so the time for X must be much longer."

How do we know whether to move up or down from C OPTION. Pls explain.

When w=12, X and Y must produce in 3 days 5/4*w = 5/4*12 = 15 widgets.
Answer choice resulted in the production of 27 widgets, a much higher number.
To reduce the number of widgets produced, we need X to work more slowly.
To work more slowly means to take more time, so we need a bigger answer choice.[/quote

Bingo! thax man.
Join the discussion