garuhape wrote:The ratio of the rates of Bob, John and Craig is 1 to 2 to 5 respectively, if the three work together on the project it takes 4 hours to complete. How long does it take John to do the job alone?
Can someone explain please why the OA is 16 and noch 32!
Thx
the short answer is because John has a rate of 2, not 1.
the long answer is because ou're working with fractions, and not real numbers. Use actual things you can visualize the problem around. Let's say that our heroes's rates are given in actual things: tables/hour, so that John makes Bob makes 1 table an hour, John makes 2 tables an hour, and Craig makes 5 tables an hour.
together, our heroes work at a rate of 1+2+5 = 8 tables an hour. After four hours, they make 4*8=32 tables - that's the work.
At a rate of 2 tables an hour, how long will it take John to do 32 tables alone?
32/2 = 16 hours.