BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATBootcamp Starts Sep 28
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE BOOTCAMP

Live Online Bootcamp Class with Top GMAT Expert Chris Peckover

15 live classes from Sep 28, 2026

Schedule
Mon to Fri · 7:00 to 10:00 PM ET
Included
Live classes + 6 months of TTP OnDemand
  • Boost your GMAT score in less than one month in a live online class
  • 6 months access to TTP OnDemand video courses included
View bootcamp & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Difficult Work/Rate Problem

Expert replies
by mattocks » Sun Mar 28, 2010 11:27 am
Can someone explain the best way to approach this problem?

It takes machine A x hours to manufacture a deck of cards that machine B can manufacture in 1/x hours. If machine A operates alone for y hours and is then joined by machine B until 100 decks are finished, for how long will the two machines operate simultaneously?

a) (100y-x)/x^2 +1
b) (100x-y)/x^2 + 1
c) (100y-x^3-x)/x^2 + 1
d) (100y-x^2y-y)/x^2 +1
e) 100x/x^2+1
Join the discussion
Source: — Problem Solving |

by thephoenix » Sun Mar 28, 2010 8:07 pm
mattocks wrote:Can someone explain the best way to approach this problem?

It takes machine A x hours to manufacture a deck of cards that machine B can manufacture in 1/x hours. If machine A operates alone for y hours and is then joined by machine B until 100 decks are finished, for how long will the two machines operate simultaneously?

a) (100y-x)/x^2 +1
b) (100x-y)/x^2 + 1
c) (100y-x^3-x)/x^2 + 1
d) (100y-x^2y-y)/x^2 +1
e) 100x/x^2+1
IMO B

solution attached
Attachments
work time.xls
(13.5 KiB) Downloaded 137 times
Join the discussion

by indiantiger » Mon Mar 29, 2010 8:48 am
Here is my approach:

Given : Machine A takes x hrs to manufacture a deck of cards
so in 1 hr how much work is done ? 1/x

same way we can get for Machine B's 1 hour work which is 1/1/x = x

now machine A operates alone for y hours so the work done by machine A alone is
= work done in 1 hour * y (hours) = y*1/x = y/x

then machine A is joined by Machine B but machine A has already done some work alone. We subtract the work done by A from 100 (which is the total work i.e the decks) = 100-y/x = (100x-y)/x

now to find out how much time the two machines operate together :

work left to do / combine work done by machines per hour = [(100x-y)/x]/x+1/x
= (100x-y)x/x(x^2+1)
= (100x-y)/x^2+1
= (B)

Please do feel free to correct me if I am doing anything wrong